Przejdź do treści
Enertrag DT_Drohne - JEWRO LR-49.jpg

Westerwald II wind project

Westerwald II wind project

ENERTRAG SE is planning to erect a total of six wind turbines in the Hauser Wald forest in Hesse on the border with Rhineland-Palatinate, located between the municipalities of Dornburg, Waldbrunn, Neunkirchen and Irmtraut.

ENERTRAG has been developing the wind farm since 2014. In addition to the informal involvement of local politicians, this has involved carrying out numerous studies and expert reports in preparation for the permit application. With the concrete preparation of the permit application now underway, this website has also been launched to provide ongoing public information on the progress of the project.

According to yield forecasts, the six planned Nordex N149 wind turbines, each with 5.7 megawatts (MW), will produce around 69,000 MWh of clean electricity per year. This means that around 19,000 households in the region can be supplied with locally generated, sustainable energy. The converted electrical energy can also save over 50,000 tons of CO2 annually.

ENERTRAG is thus acting for a clean and secure future for the benefit of the people in the country and future generations on the basis of 100% renewable energies.

westerwald_karte.jpg

Citizen information on the wind farm project in Hauser Wald dated 20/01/2023

01/30/2023

Around 150 local residents took up the invitation to find out more about the wind farm project in Hauser Wald with great interest on January 20.

You can read the detailed report directly on the Publication page of the municipality of Waldbrunn (Westerwald). Thank you for your interest and the good exchange.

Click here for the follow-up report on the information event Wind power | Waldbrunn - Westerwald

Aufsichtsratsvorsitzender_2022_Joerg_Mueller.jpg
"Together, we are committed to everything that makes energy safe and sustainable as a basis of life for us humans. In this way, we strengthen rural regions with well-paid work, training and affordable energy. At the same time, we pay attention to promoting infrastructure and culture at all our locations."

Jörg Müller

Chairman of the Supervisory Board of ENERTRAG SE

Location and planning area

The planning area is located in Hauser Wald, on land belonging to the municipalities of Waldbrunn, Dornburg and HessenForst.

The wind suitability area in question is suitable for the construction of wind turbines according to regional planning criteria and is designated as priority area 1103 in the 2019 Central Hessen Energy Sub-regional Plan. This is an area which, according to the list of criteria, maintains a sufficient protective distance from residential buildings with regard to noise and shadow emissions and is not located in any nature conservation area or water protection area III.

In the Central Hesse region, 127 areas covering approx. 12,100 hectares have been designated as wind priority areas. This corresponds to 2.2 percent of the region's area.

Plan_LAyout_Westerwald.png

Approval procedure and timetable

The plan is to submit the complete application for approval in accordance with Section 4 BImSchG to the RP Gießen in mid-2023. Approval is expected to be granted at the end of 2024.

We will keep you informed about the next steps here.

Windpark_Westerwald_Planung_mit_Zeittafel_Stand_18012023.png

Wind energy im Forst

Several dry years, storm events and pest infestations have taken a heavy toll on forests in Germany, and the drought years of 2018 to 2020 in particular meant that in some regions soils dried out to a depth of 1.80 meters, foliage was shed prematurely and the bark beetle was able to spread en masse. In Hesse, forests make up around 42 percent of the state's land area, or around 894,000 hectares. Here, too, some of the forest areas are severely damaged - the results of the 2022 forest condition survey show that the Hessian forest has been in a persistently poor state of vitality since 2019 (Hessian Ministry for the Environment, Climate Protection, Agriculture and Consumer Protection: Forest Condition Report 2022).

Wind energy can provide partial relief. There is therefore much to be said for the use of wind turbines in forests: Wind energy in Germany recently saved 100.9 million tons of greenhouse gases that would otherwise affect the forest (Bundesverband Windenergie 2021: Windenergie im Forst. How wind energy contributes to forest protection). In addition, the compensation of built-up areas through reforestation and forest conversion measures promotes the creation of climate-resistant forest stands.

In the revised State Development Plan (LEP) of 2018, the state government of the CDU and Bündnis 90/Die Grünen committed to promoting the expansion of wind energy in Hesse by providing suitable state-owned forest land. The basis for the construction of wind turbines in forests in Hesse is provided by the third ordinance amending the LEP. According to this, the construction of wind turbines in forests is possible under certain conditions. In the case of this project in Hauser Wald, particular care is taken to ensure that the existing road network is used primarily as access routes and that no young beech stands are cleared.

Wald_Westerwald.jpg

Photo: Fork in the path in the Hauser Wald priority area: view towards WTG D5 (towards the car)

We are ENERTRAG

ENERTRAG produces renewable energy in a sustainable way, to keep the Earth habitable. Together. With passion. Energy ahead.

Learn more

System technology

The six Nordex N149 wind turbines, each with a rated output of 5.7 MW, have a hub height of 164 m and a rotor diameter of 149 m. This results in a total height of 238.5 m.

To the manufacturer page N149/5.X - Nordex SE

Citizen and municipal participation

Participation takes many forms. In addition to informal participation within the planning process, it is of course also about economic participation. It is also about ensuring that residents and communities in the vicinity of wind farms benefit appropriately from local wind power generation.

Participation in accordance with Section 6 EEG (Renewable Energy Sources Act)

Since the EEG 2021, Section 6 has made it possible to offer municipalities within a radius of 2,500 meters of new wind turbines a unilateral grant or financial participation without consideration. The law does not yet apply retroactively to existing wind farms, but only to newly commissioned WTGs. The grant fulfills the following important criteria: It is to be offered voluntarily and is not earmarked for a specific purpose, it is not included in the calculation of the district levy and is paid annually over the entire 20-year EEG term of the WTG. The amount of the payment depends on the annual amount of energy fed into the grid by the WTG. ENERTRAG regularly offers this voluntary contribution to all municipalities in the specific project areas and is also prepared to do so in this specific project.

In the Westerwald II project, ENERTRAG is planning an annual energy feed-in volume of an estimated 69,000 megawatt hours (MWh). This feed-in quantity multiplied by the amount of EUR 2 per megawatt hour (0.2 cents/kWh) payable under Section 6 of the German Renewable Energy Sources Act (EEG) results in a calculated sum of an estimated EUR 138,000 per year, which in turn is divided proportionately according to the municipal area or the area of the surrounding municipalities within a 2.5 km radius of the respective WTG, and is paid to the municipalities annually over the period of operation of the WTG.

Windpark_Westerwald_EEG___6_Stand_23112022.png

The worldwide success of ENERTRAG projects

ENERTRAG uses its 30 years of experience worldwide to accelerate the transition to renewable energies.

Lübs-Ferdinandshof wind project

Moc znamionowa 4.5 MW
W eksploatacji od 2016
Lokalizacja Lübs
Status w eksploatacji
Windkraft Uckermark 2024 LR-191.jpg

Penkun wind project

Moc znamionowa 4.2 MW
W eksploatacji od 2018
Lokalizacja Penkun
Status w eksploatacji
Enertrag_Windpark_23 JR_HR-9.jpg

Lüssow-Schmatzin wind project

Moc znamionowa 4.8 - 5.3 MW
W eksploatacji od 2019
Lokalizacja Lüssow
Status planowany
IMG_0684.jpg

Schönfeld project complex

Moc znamionowa 10.5 MW
W eksploatacji od 2020
Lokalizacja Schönfeld
Status w eksploatacji
Koppelsee_bald_IBN.jpg

Mattheshöhe project complex

Moc znamionowa 54.67 MW
W eksploatacji od 2019
Lokalizacja Matteshöhe
Status w eksploatacji
Enertrag DT_Drohne - JEWRO LR-102.jpg

Ramin wind project

Moc znamionowa 33 MW
W eksploatacji od 2027
Lokalizacja Ramin
Status planowany
geplante_Windenergieanlage.jpeg

Rosow community energy project

Moc znamionowa 20.7 MW
W eksploatacji od 2020
Lokalizacja Rosow
Status w eksploatacji
News_Service.jpg

Dauer project complex

Moc znamionowa 27.43 MW
W eksploatacji od 2015
Lokalizacja Duration
Status w eksploatacji
Windkraft Uckermark 2024 LR-18.jpg

Kassow wind project

Moc znamionowa 5.7 MW
W eksploatacji od
Lokalizacja Kassow
Status w budowie
Enertrag_Windpark_23 JR_HR-219.jpg

Bonnhagen I wind project

Moc znamionowa 24 MW
W eksploatacji od 2025
Lokalizacja Bonnhagen
Status w budowie
Lageplan_Ramelsloh_2022.jpeg

Ramelsloh wind project

Moc znamionowa 4.2 MW
W eksploatacji od 2023
Lokalizacja Ramelsloh
Status w eksploatacji
geplante_Windenergieanlage.jpeg

Iserlohn wind project

Moc znamionowa 12 MW
W eksploatacji od 2025
Lokalizacja Iserlohn
Status w budowie
Wald_Westerwald.jpg

Westerwald II wind project

Moc znamionowa 34.2 MW
W eksploatacji od 2028
Lokalizacja Hauser Forest
Status planowany
nordkirchen.jpg

Nordkirchen wind project

Moc znamionowa 14.1 MW
W eksploatacji od 2027
Lokalizacja Nordkirchen
Status planowany
geplante_Windenergieanlage.jpeg

Anklam combined cycle power plant

Moc znamionowa 240 MW electrolysis
W eksploatacji od 2024
Lokalizacja Anklam
Status planowany
Chemin de Tuleras.1.jpg

CHEMIN DE TULERAS

Moc znamionowa 12 MW
W eksploatacji od 2006
Lokalizacja Villemeux, Boulay-Thierry
Status w eksploatacji
France4.jpg

SAINT-ANDRÉ-FARIVILLERS

Moc znamionowa 11.5 MW
W eksploatacji od 2008
Lokalizacja Saint-André-Farivillers
Status w eksploatacji
Campremy-20.jpg

CAMPREMY-BONVILLERS

Moc znamionowa 11.5 MW
W eksploatacji od 2011
Lokalizacja Campremy, Bonvillers
Status w eksploatacji
France.jpg

CHEMIN-BLANC

Moc znamionowa 12 MW
W eksploatacji od 2012
Lokalizacja Francastel
Status w eksploatacji
Campremy-20.jpg

DEMI-LIEUE

Moc znamionowa 12 MW
W eksploatacji od 2011
Lokalizacja Crèvecoeur le Grand, Viefvilliers
Status w eksploatacji
ENERTRAG_-Construction-Levage-sizing.jpg

ROINVILLE

Moc znamionowa 8 MW
W eksploatacji od 2006
Lokalizacja Roinville
Status w eksploatacji
France4.jpg

ORESMAUX

Moc znamionowa 12 MW
W eksploatacji od 2008
Lokalizacja Oresmaux
Status w eksploatacji
France3.jpg

FRESNOY-AU-VAL

Moc znamionowa 10 MW
W eksploatacji od 2013
Lokalizacja Fresnoy, Bougainville
Status w eksploatacji
France4.jpg

BOUGAINVILLE

Moc znamionowa 12 MW
W eksploatacji od 2005
Lokalizacja Bougainville
Status w eksploatacji
Campremy-20.jpg

CAIX

Moc znamionowa 12 MW
W eksploatacji od 2013
Lokalizacja Caix
Status w eksploatacji
France4.jpg

LIANCOURT

Moc znamionowa 7 MW
W eksploatacji od 2017
Lokalizacja Liancourt- Fosse
Status w eksploatacji
France.jpg

REMIGNY-LY-FONTAINE

Moc znamionowa 18.4 MW
W eksploatacji od 2015
Lokalizacja Rémigny, Ly-Fontaine
Status w eksploatacji
Campremy-20.jpg

LA BRIE CHAMPENOISE

Moc znamionowa 20 MW
W eksploatacji od 2015
Lokalizacja Corfélix, La Villeneuve les Charleville, Charleville
Status w eksploatacji
ENERTRAG_-Construction-Levage-sizing.jpg

ANGUILCOURT

Moc znamionowa 12 MW
W eksploatacji od 2016
Lokalizacja Anguilcourt, Brissay-Choigny
Status w eksploatacji
France.jpg

SISSY-MÉZIERES

Moc znamionowa 10 MW
W eksploatacji od 2017
Lokalizacja Sissy, Châtillon-sur-Oise, Mézières
Status w eksploatacji
France4.jpg

SOUTH TERNOIS

Moc znamionowa 13.8 MW
W eksploatacji od 2011
Lokalizacja Croisette, Héricourt, Hauteclocque
Status w eksploatacji
France3.jpg

EAST TERNOIS

Moc znamionowa 11.5 MW
W eksploatacji od 2011
Lokalizacja Ligny Saint Flochel
Status w eksploatacji
ENERTRAG_-Construction-Levage-sizing.jpg

CROISETTE I

Moc znamionowa 12 MW
W eksploatacji od 2015
Lokalizacja Croisette
Status w eksploatacji
France3.jpg

CROISETTE II

Moc znamionowa 5 MW
W eksploatacji od 2015
Lokalizacja Beauvois, Croix-en-Ternois, Siracourt
Status w eksploatacji
France.jpg

LA VILLE-AUX-BOIS-LÈS-DIZY

Moc znamionowa 8 MW
W eksploatacji od 2016
Lokalizacja La Ville-aux-Bois-Lès-Dizy
Status w eksploatacji
France4.jpg

TERNOIS NORTH

Moc znamionowa 9.2 MW
W eksploatacji od 2012
Lokalizacja Brias, Monchy Breton
Status w eksploatacji

Contact

Fields
Cloudflare Turnstile Captcha

Further information on the processing of your personal data can be found in our privacy notice.