Przejdź do treści
Enertrag DT_Drohne - JEWRO LR-60.jpg

Lübs-Ferdinandshof wind project

Lübs-Ferdinandshof wind project

ENERTRAG has been planning a new, regionally significant energy project for several years, for which a separate approval procedure with public participation is to be carried out. In this context, transparent information should be provided at this point.

In addition to the environmentally friendly construction and operation of up to 12 powerful wind turbines, the project involves the participation of citizens and local authorities as well as the integration of one of the most important industrial companies in the region, Eisengießerei Torgelow GmbH, and is therefore an important project in the concrete implementation of the energy transition in the region.

ENERTRAG is thus acting for a clean and secure future for the benefit of the people of the country and future generations on the basis of 100% renewable energies.

Green maintenance in the municipality of Lübs

08/19/2020

New equipment for green maintenance.

Last weekend, ENERTRAG project developer Ralf Groth presented a donation in kind to the 1st Deputy Mayor of the municipality of Lübs, Karsten Kietzmann.

To support the municipality of Lübs, ENERTRAG provided a brush cutter to help with work on the cemetery and green areas.

The sponsored tool is intended to make work easier in future.

Planning area and status of the procedure

The Lübs-Ferdinandshof wind project is located in the municipality of Lübs (district of Vorpommern-Greifswald) south of the village of Altwigshagen and north of Ferdinandshof. The project area is bordered by the B109 federal highway to the east, the so-called Milchstraße to the west and crossed by the Berlin-Stralsund railroad line.

The project area is suitable for the erection of wind turbines according to the standard state criteria of Mecklenburg-Vorpommern and is therefore designated as a suitable area in the draft for the partial update of the Vorpommern regional plan with the area number 34/2015. The area is also very suitable for the planned project for several other reasons. These include:

  • Very good wind conditions for efficient wind energy use good accessibility due to direct connection to the main road
  • Pre-existing structural features due to existing railroad and power lines
  • Significantly increased distances to settlements compared to applicable minimum requirements
  • Proximity to existing power lines for grid connection
  • Proximity to the town of Torgelow and iron foundry as energy consumption centers in the region
  • Suitable location with regard to noise and shadow impact emissions

Area no. 34/2015 has a total size of approx. 266 ha, whereby only a few ha are to be used for development. The construction and operation of 12 wind turbines is currently planned here as part of the project applied for.
An application for approval in accordance with Section 4 BImSchG was submitted for the project in May 2016. This has since been revised and updated in light of the update of the regional plan.
As part of the approval process, all documents will be made available to the public in order to give residents, associations and authorities the opportunity to find out about the plans and make comments.

 

Planned wind turbines

The construction and operation of 12 NORDEX N149 wind turbines is currently planned for the Lübs-Ferdinandshof wind project.

The N149 wind turbines have a rotor diameter of approx. 149 m and an installed rated output of 4.0-4.5 megawatts (MW). The hub height of the turbine is approx. 164 m.

The N149 is the highest-yielding turbine for locations with wind conditions away from the direct coastline. Compared to previous models, the turbine has a 30 percent larger swept rotor area. As the maximum output of the turbine can be varied between 4.0 and 4.5 MW, it can be optimally adapted to the individual site grid specifications, local wind conditions and noise requirements. The N149/4.0-4.5 thus ensures that the highest possible energy yield is generated.

This project involves the "N149/4.38 STE 4.38MW" turbine specification with 4.38 MW and integrated serration components (STE) for noise optimization, which was specially selected for the site.

2024_ENERTRAG_Joerg_Mueller.jpg
"We are shaping the next phase of energy transition."

Jörg Müller

Chairman of the Supervisory Board of ENERTRAG SE

Citizen and municipal participation

Forms of participation

Participation takes many forms. ENERTRAG has always stood for broad and multi-layered participation by citizens and local authorities. In addition to informal participation within the planning process, it is of course also about economic participation. To this end, ENERTRAG has been supporting a large number of citizens' energy companies for years. Regional companies such as municipal utilities are also involved in the operation of the projects.

In Mecklenburg-Western Pomerania, the legislator has gone one step further and regulated the economic participation of citizens and municipalities by law.

Citizen and municipal participation law

The Citizen and Municipal Participation Act came into force on May 28, 2016. The basic idea of the law is to oblige project sponsors. They are to establish a limited liability company for new wind farms and then offer shares of at least 20 percent in this company to their immediate neighbors for participation. Each share may cost a maximum of 500 euros.

There are several ways to participate. Instead of acquiring shares in the company (which will operate the future wind farm), project promoters can offer the local and neighboring communities within a radius of 5 kilometers to receive an annual compensatory levy instead. The decision is made by the municipality.

In addition, the project sponsors are free to offer citizens a savings product instead of shares. This reduces the risk for private investors. By acquiring shares, they would bear not only the profits but also the losses of a project within the scope of the respective investment. One option with less risk would be to acquire a savings product. In this case, the project company could transfer profits of 10 percent to a bank. Neighbors within a five-kilometer radius can set up savings bonds or fixed-term deposits with this bank, for example. The interest on the invested money is paid with the profit from the wind farm.

Borkenfriede eG energy cooperative

Energiegenossenschaft Borkenfriede eG stands for the promotion, support and advice on issues relating to renewable energy generation. It thus offers a further approach to participation on a cooperative basis.

It is not yet clear which specific form of participation is best suited to this wind project in order to best meet the needs and wishes of local residents and communities. A continuous, well-founded consultation process with citizens and local authorities is extremely important for this. ENERTRAG will offer question and answer sessions for local residents and work closely with the municipal councils.

DJI_0268.jpg
DJI_0268.jpg

About ENERTRAG

ENERTRAG develops, builds and operates energy solutions from wind, photovoltaics and hydrogen to drive forward the energy transition worldwide - and to completely replace fossil fuels in the energy supply. 

Learn more

Other projects

The goal: 100 per cent fossil-free - worldwide. To achieve this, ENERTRAG is turning pioneering ideas into sustainable, viable solutions.

Lübs-Ferdinandshof wind project

Moc znamionowa 4.5 MW
W eksploatacji od 2016
Lokalizacja Lübs
Status w eksploatacji
Windkraft Uckermark 2024 LR-191.jpg

Penkun wind project

Moc znamionowa 4.2 MW
W eksploatacji od 2018
Lokalizacja Penkun
Status w eksploatacji
Enertrag_Windpark_23 JR_HR-9.jpg

Lüssow-Schmatzin wind project

Moc znamionowa 4.8 - 5.3 MW
W eksploatacji od 2019
Lokalizacja Lüssow
Status planowany
IMG_0684.jpg

Schönfeld project complex

Moc znamionowa 10.5 MW
W eksploatacji od 2020
Lokalizacja Schönfeld
Status w eksploatacji
Koppelsee_bald_IBN.jpg

Mattheshöhe project complex

Moc znamionowa 54.67 MW
W eksploatacji od 2019
Lokalizacja Matteshöhe
Status w eksploatacji
Enertrag DT_Drohne - JEWRO LR-102.jpg

Ramin wind project

Moc znamionowa 33 MW
W eksploatacji od 2027
Lokalizacja Ramin
Status planowany
geplante_Windenergieanlage.jpeg

Rosow community energy project

Moc znamionowa 20.7 MW
W eksploatacji od 2020
Lokalizacja Rosow
Status w eksploatacji
News_Service.jpg

Dauer project complex

Moc znamionowa 27.43 MW
W eksploatacji od 2015
Lokalizacja Duration
Status w eksploatacji
Windkraft Uckermark 2024 LR-18.jpg

Kassow wind project

Moc znamionowa 5.7 MW
W eksploatacji od
Lokalizacja Kassow
Status w budowie
Enertrag_Windpark_23 JR_HR-219.jpg

Bonnhagen I wind project

Moc znamionowa 24 MW
W eksploatacji od 2025
Lokalizacja Bonnhagen
Status w budowie
Lageplan_Ramelsloh_2022.jpeg

Ramelsloh wind project

Moc znamionowa 4.2 MW
W eksploatacji od 2023
Lokalizacja Ramelsloh
Status w eksploatacji
geplante_Windenergieanlage.jpeg

Iserlohn wind project

Moc znamionowa 12 MW
W eksploatacji od 2025
Lokalizacja Iserlohn
Status w budowie
Wald_Westerwald.jpg

Westerwald II wind project

Moc znamionowa 34.2 MW
W eksploatacji od 2028
Lokalizacja Hauser Forest
Status planowany
nordkirchen.jpg

Nordkirchen wind project

Moc znamionowa 14.1 MW
W eksploatacji od 2027
Lokalizacja Nordkirchen
Status planowany
geplante_Windenergieanlage.jpeg

Anklam combined cycle power plant

Moc znamionowa 240 MW electrolysis
W eksploatacji od 2024
Lokalizacja Anklam
Status planowany
Chemin de Tuleras.1.jpg

CHEMIN DE TULERAS

Moc znamionowa 12 MW
W eksploatacji od 2006
Lokalizacja Villemeux, Boulay-Thierry
Status w eksploatacji
France4.jpg

SAINT-ANDRÉ-FARIVILLERS

Moc znamionowa 11.5 MW
W eksploatacji od 2008
Lokalizacja Saint-André-Farivillers
Status w eksploatacji
Campremy-20.jpg

CAMPREMY-BONVILLERS

Moc znamionowa 11.5 MW
W eksploatacji od 2011
Lokalizacja Campremy, Bonvillers
Status w eksploatacji
France.jpg

CHEMIN-BLANC

Moc znamionowa 12 MW
W eksploatacji od 2012
Lokalizacja Francastel
Status w eksploatacji
Campremy-20.jpg

DEMI-LIEUE

Moc znamionowa 12 MW
W eksploatacji od 2011
Lokalizacja Crèvecoeur le Grand, Viefvilliers
Status w eksploatacji
ENERTRAG_-Construction-Levage-sizing.jpg

ROINVILLE

Moc znamionowa 8 MW
W eksploatacji od 2006
Lokalizacja Roinville
Status w eksploatacji
France4.jpg

ORESMAUX

Moc znamionowa 12 MW
W eksploatacji od 2008
Lokalizacja Oresmaux
Status w eksploatacji
France3.jpg

FRESNOY-AU-VAL

Moc znamionowa 10 MW
W eksploatacji od 2013
Lokalizacja Fresnoy, Bougainville
Status w eksploatacji
France4.jpg

BOUGAINVILLE

Moc znamionowa 12 MW
W eksploatacji od 2005
Lokalizacja Bougainville
Status w eksploatacji
Campremy-20.jpg

CAIX

Moc znamionowa 12 MW
W eksploatacji od 2013
Lokalizacja Caix
Status w eksploatacji
France4.jpg

LIANCOURT

Moc znamionowa 7 MW
W eksploatacji od 2017
Lokalizacja Liancourt- Fosse
Status w eksploatacji
France.jpg

REMIGNY-LY-FONTAINE

Moc znamionowa 18.4 MW
W eksploatacji od 2015
Lokalizacja Rémigny, Ly-Fontaine
Status w eksploatacji
Campremy-20.jpg

LA BRIE CHAMPENOISE

Moc znamionowa 20 MW
W eksploatacji od 2015
Lokalizacja Corfélix, La Villeneuve les Charleville, Charleville
Status w eksploatacji
ENERTRAG_-Construction-Levage-sizing.jpg

ANGUILCOURT

Moc znamionowa 12 MW
W eksploatacji od 2016
Lokalizacja Anguilcourt, Brissay-Choigny
Status w eksploatacji
France.jpg

SISSY-MÉZIERES

Moc znamionowa 10 MW
W eksploatacji od 2017
Lokalizacja Sissy, Châtillon-sur-Oise, Mézières
Status w eksploatacji
France4.jpg

SOUTH TERNOIS

Moc znamionowa 13.8 MW
W eksploatacji od 2011
Lokalizacja Croisette, Héricourt, Hauteclocque
Status w eksploatacji
France3.jpg

EAST TERNOIS

Moc znamionowa 11.5 MW
W eksploatacji od 2011
Lokalizacja Ligny Saint Flochel
Status w eksploatacji
ENERTRAG_-Construction-Levage-sizing.jpg

CROISETTE I

Moc znamionowa 12 MW
W eksploatacji od 2015
Lokalizacja Croisette
Status w eksploatacji
France3.jpg

CROISETTE II

Moc znamionowa 5 MW
W eksploatacji od 2015
Lokalizacja Beauvois, Croix-en-Ternois, Siracourt
Status w eksploatacji
France.jpg

LA VILLE-AUX-BOIS-LÈS-DIZY

Moc znamionowa 8 MW
W eksploatacji od 2016
Lokalizacja La Ville-aux-Bois-Lès-Dizy
Status w eksploatacji
France4.jpg

TERNOIS NORTH

Moc znamionowa 9.2 MW
W eksploatacji od 2012
Lokalizacja Brias, Monchy Breton
Status w eksploatacji

Contact

Fields
Cloudflare Turnstile Captcha

Further information on the processing of your personal data can be found in our privacy notice.