Przejdź do treści
kassow.jpg

Kassow wind project

Kassow wind project

ENERTRAG has been planning a new, regionally significant energy project for several years, for which a separate approval procedure with public participation is being carried out. In this context, transparent information should be provided at this point.

In addition to the environmentally friendly construction and operation of a powerful wind turbine, the project involves the participation of citizens and local authorities as well as the involvement of one of the most important industrial companies in the region, Nordex from Rostock, and is therefore an important project in the concrete implementation of the energy transition in the region.

ENERTRAG is thus acting for a clean and secure future for the benefit of the people of the country and future generations on the basis of 100% renewable energies.

Against the background of the economic and technical development of wind turbines, regional locations for measuring and testing new or further developed turbine types are of particular importance for turbine manufacturers.

Nordex develops and produces its wind turbines at the Rostock site in Mecklenburg-Western Pomerania. Nordex currently employs over 1,400 people from various departments in Rostock. In order to safeguard the company's innovative strength and the technical development of its turbines, it is essential for Nordex to be able to erect facilities that are to be used for research and measurement work and to carry out measurements. Such facilities and measurement sites in Mecklenburg-Vorpommern are important for Nordex as they are close to the development and production site. This is an important condition for a facility that is to be used for research and measurement work, as it ensures that the company's technicians and engineers have rapid access to the measurement facilities. The promotion of regional added value through the proximity of the site to the development and production facilities of the manufacturer Nordex Energy GmbH therefore plays just as important a role as the good suitability of the location. Nordex is constantly working on the further development of the DELTA 4000 turbine generation.

There are plans to erect a NORDEX N149/5.X turbine with a 125 m tubular steel tower for research and measurement purposes at the Kassow site.

Receipt of BImSchG approval for the construction and operation of the WTG

09/30/2021

After receiving the permit, construction can now begin.
 
After more than three years of project development, ENERTRAG has reached another milestone in the realization of the Kassow wind project. On 2 August 2021, the responsible approval authority (State Office for Agriculture and the Environment of Central Mecklenburg) issued the BImSchG permit in accordance with Section 4 for the planned "MS B3" Nordex N149/5.X wind turbine with a hub height of 125 m, a rotor diameter of 149 m and a rated output of 5.7 megawatts.

Numerous expert opinions and studies on fauna, flora, noise and shadow immissions as well as information events with local residents preceded the decision. As a result, many issues relevant to the planning process were recorded, discussed, documented in expert reports and dealt with appropriately in advance.

ENERTRAG has now begun to tackle the next steps quickly. This relates in particular to the preparatory measures for the construction of the wind turbine and informing the neighboring communities and residents. Construction will take place in close coordination with the local communities and farmers, as well as the project partners such as NORDEX.

Construction is planned for the period from the end of 2021 to spring 2022.

"50 ENERTRAG Verbundkraftwerke® could cover half of the electricity required in Germany in the future."

Dr. Tobias Bischof-Niemz

ENERTRAG Board Member Projects International & Technology

Planning area and status of the procedure

The Kassow wind project is located in the municipality of Kassow (district of Rostock) south of the village of Kassow and north of Groß Schwiesow. The project area is bordered by the village of Oettelin to the west and Goldewin to the east and is crossed by two high-voltage power lines.

The project area is suitable for the erection of wind turbines according to the standard state criteria of Mecklenburg-Vorpommern and is therefore designated as a suitable area in the draft for the partial update of the energy chapter of the Rostock regional spatial development program with the area number 55/58 "Mistorf". In December 2019 and June 2020, the Rostock Region Planning Association decided on the update of the regional spatial development program and assumes that the update of the spatial development program will become binding at the end of 2020.

The area is also very suitable for the planned project, taking into account several other aspects. These include

Good wind conditions for efficient wind energy use

Visual integration into an existing wind farm

Structural pre-determination by existing railroad and power lines

Proximity to existing power lines for the grid connection

Direct grid feed-in point due to existing ENERTRAG substation

Proximity to the city of Rostock and the Nordex company for measurement and maintenance work as well as short distances during delivery and construction of the wind turbines

Suitable location with regard to noise and shadow impact emissions.

An application for approval in accordance with Section 4 BImSchG was submitted for the project in spring 2019. As part of the approval procedure, all documents will be put on public display to give residents, associations and authorities the opportunity to find out about the plans and make comments.

Standort_Kassow.jpg

Planned wind turbine

The construction and operation of a Nordex N149/5.X wind turbine with a capacity of 5.7 MW and a hub height of 125 m is currently planned for the Kassow wind project. This is a turbine of the new DELTA 4000 wind turbine generation from Nordex, which is to be used for research and measurement work.

With a rated output of 5.7 megawatts (MW) and a rotor diameter of 149 m, the N149/5.X is one of the highest-yielding turbines for locations with wind conditions away from the direct coastline. A single wind turbine can supply up to 5,000 households or 11,000 electric cars with clean electricity and save around 9,500 tons ofCO2 per year.

geplante_Windenergieanlage.jpeg
2021_02_25_Dark_Sky.jpg
2021_02_25_Dark_Sky.jpg

We are ENERTRAG

ENERTRAG produces renewable energy in a sustainable way, to keep the Earth habitable. Together. With passion. Energy ahead.

Learn more

Demand-oriented firing

Wind turbines must be marked as an obstacle to aviation as soon as they exceed a total height of 100 meters. In practice, this means that entire wind farms flash red at night to warn approaching pilots. This lighting has become one of the biggest acceptance problems in the realization of wind energy projects, as it can also be perceived as a nuisance on the ground.

Switch it off now! What if the lights were only switched on when they are actually needed? People have been talking about switching off the red flashing lights on the horizon for years. But little has happened nationwide so far. In December 2018, the German government decided that from July 1, 2020, all wind turbines in Germany must be equipped with a demand-controlled night-time marking system.

By installing a system for so-called demand-controlled night-time marking (BNK), night-time light emissions will also be reduced by up to 95% for the wind project in Kassow. The light is only activated when an aircraft within a radius of 4 km and at an altitude of less than 600 m approaches the wind farm.

ENERTRAG has brought the demand-controlled night-time marking system to series maturity in recent years and already offers solutions for the demand-controlled night-time marking of wind turbines through its subsidiary DARK SKY.

Citizen and municipal participation

Forms of participation

Participation takes many forms. In addition to informal participation within the planning process, it is of course also about economic participation. In other words, ensuring that residents and communities in the vicinity of wind farms benefit appropriately from local wind power generation. In Mecklenburg-Western Pomerania, the economic participation of citizens and municipalities has even been regulated by law since 2016.

Citizen and community participation act

The M-V Citizen and Community Participation Act obliges project developers to offer wind farm residents - including residents and municipalities within a five-kilometre radius - shares of at least 20 percent in new wind farms. Each share may cost a maximum of 500 euros.

Alternatively, a combination of an annual equalization levy for municipalities and a savings product for residents can also be offered. This reduces the risk for municipalities and residents. When acquiring shares in the wind farm company, both profits and losses from a project must be borne as part of the respective investment. The equalization levy for municipalities is fixed and is calculated on the basis of the profit expected from a 10% stake in the company. It is paid out annually and must be earmarked for infrastructure and energy-saving measures. In the case of the savings product for citizens, the minimum interest rate is also calculated on the basis of the wind farm yield.

Further information on the law is available from the State Energy and Climate Protection Agency M-V: www.leka-mv.de/Beteiligung/

The worldwide success of ENERTRAG projects

ENERTRAG uses its 30 years of experience worldwide to accelerate the transition to renewable energies.

Lübs-Ferdinandshof wind project

Moc znamionowa 4.5 MW
W eksploatacji od 2016
Lokalizacja Lübs
Status w eksploatacji
Windkraft Uckermark 2024 LR-191.jpg

Penkun wind project

Moc znamionowa 4.2 MW
W eksploatacji od 2018
Lokalizacja Penkun
Status w eksploatacji
Enertrag_Windpark_23 JR_HR-9.jpg

Lüssow-Schmatzin wind project

Moc znamionowa 4.8 - 5.3 MW
W eksploatacji od 2019
Lokalizacja Lüssow
Status planowany
IMG_0684.jpg

Schönfeld project complex

Moc znamionowa 10.5 MW
W eksploatacji od 2020
Lokalizacja Schönfeld
Status w eksploatacji
Koppelsee_bald_IBN.jpg

Mattheshöhe project complex

Moc znamionowa 54.67 MW
W eksploatacji od 2019
Lokalizacja Matteshöhe
Status w eksploatacji
Enertrag DT_Drohne - JEWRO LR-102.jpg

Ramin wind project

Moc znamionowa 33 MW
W eksploatacji od 2027
Lokalizacja Ramin
Status planowany
geplante_Windenergieanlage.jpeg

Rosow community energy project

Moc znamionowa 20.7 MW
W eksploatacji od 2020
Lokalizacja Rosow
Status w eksploatacji
News_Service.jpg

Dauer project complex

Moc znamionowa 27.43 MW
W eksploatacji od 2015
Lokalizacja Duration
Status w eksploatacji
Windkraft Uckermark 2024 LR-18.jpg

Kassow wind project

Moc znamionowa 5.7 MW
W eksploatacji od
Lokalizacja Kassow
Status w budowie
Enertrag_Windpark_23 JR_HR-219.jpg

Bonnhagen I wind project

Moc znamionowa 24 MW
W eksploatacji od 2025
Lokalizacja Bonnhagen
Status w budowie
Lageplan_Ramelsloh_2022.jpeg

Ramelsloh wind project

Moc znamionowa 4.2 MW
W eksploatacji od 2023
Lokalizacja Ramelsloh
Status w eksploatacji
geplante_Windenergieanlage.jpeg

Iserlohn wind project

Moc znamionowa 12 MW
W eksploatacji od 2025
Lokalizacja Iserlohn
Status w budowie
Wald_Westerwald.jpg

Westerwald II wind project

Moc znamionowa 34.2 MW
W eksploatacji od 2028
Lokalizacja Hauser Forest
Status planowany
nordkirchen.jpg

Nordkirchen wind project

Moc znamionowa 14.1 MW
W eksploatacji od 2027
Lokalizacja Nordkirchen
Status planowany
geplante_Windenergieanlage.jpeg

Anklam combined cycle power plant

Moc znamionowa 240 MW electrolysis
W eksploatacji od 2024
Lokalizacja Anklam
Status planowany
Chemin de Tuleras.1.jpg

CHEMIN DE TULERAS

Moc znamionowa 12 MW
W eksploatacji od 2006
Lokalizacja Villemeux, Boulay-Thierry
Status w eksploatacji
France4.jpg

SAINT-ANDRÉ-FARIVILLERS

Moc znamionowa 11.5 MW
W eksploatacji od 2008
Lokalizacja Saint-André-Farivillers
Status w eksploatacji
Campremy-20.jpg

CAMPREMY-BONVILLERS

Moc znamionowa 11.5 MW
W eksploatacji od 2011
Lokalizacja Campremy, Bonvillers
Status w eksploatacji
France.jpg

CHEMIN-BLANC

Moc znamionowa 12 MW
W eksploatacji od 2012
Lokalizacja Francastel
Status w eksploatacji
Campremy-20.jpg

DEMI-LIEUE

Moc znamionowa 12 MW
W eksploatacji od 2011
Lokalizacja Crèvecoeur le Grand, Viefvilliers
Status w eksploatacji
ENERTRAG_-Construction-Levage-sizing.jpg

ROINVILLE

Moc znamionowa 8 MW
W eksploatacji od 2006
Lokalizacja Roinville
Status w eksploatacji
France4.jpg

ORESMAUX

Moc znamionowa 12 MW
W eksploatacji od 2008
Lokalizacja Oresmaux
Status w eksploatacji
France3.jpg

FRESNOY-AU-VAL

Moc znamionowa 10 MW
W eksploatacji od 2013
Lokalizacja Fresnoy, Bougainville
Status w eksploatacji
France4.jpg

BOUGAINVILLE

Moc znamionowa 12 MW
W eksploatacji od 2005
Lokalizacja Bougainville
Status w eksploatacji
Campremy-20.jpg

CAIX

Moc znamionowa 12 MW
W eksploatacji od 2013
Lokalizacja Caix
Status w eksploatacji
France4.jpg

LIANCOURT

Moc znamionowa 7 MW
W eksploatacji od 2017
Lokalizacja Liancourt- Fosse
Status w eksploatacji
France.jpg

REMIGNY-LY-FONTAINE

Moc znamionowa 18.4 MW
W eksploatacji od 2015
Lokalizacja Rémigny, Ly-Fontaine
Status w eksploatacji
Campremy-20.jpg

LA BRIE CHAMPENOISE

Moc znamionowa 20 MW
W eksploatacji od 2015
Lokalizacja Corfélix, La Villeneuve les Charleville, Charleville
Status w eksploatacji
ENERTRAG_-Construction-Levage-sizing.jpg

ANGUILCOURT

Moc znamionowa 12 MW
W eksploatacji od 2016
Lokalizacja Anguilcourt, Brissay-Choigny
Status w eksploatacji
France.jpg

SISSY-MÉZIERES

Moc znamionowa 10 MW
W eksploatacji od 2017
Lokalizacja Sissy, Châtillon-sur-Oise, Mézières
Status w eksploatacji
France4.jpg

SOUTH TERNOIS

Moc znamionowa 13.8 MW
W eksploatacji od 2011
Lokalizacja Croisette, Héricourt, Hauteclocque
Status w eksploatacji
France3.jpg

EAST TERNOIS

Moc znamionowa 11.5 MW
W eksploatacji od 2011
Lokalizacja Ligny Saint Flochel
Status w eksploatacji
ENERTRAG_-Construction-Levage-sizing.jpg

CROISETTE I

Moc znamionowa 12 MW
W eksploatacji od 2015
Lokalizacja Croisette
Status w eksploatacji
France3.jpg

CROISETTE II

Moc znamionowa 5 MW
W eksploatacji od 2015
Lokalizacja Beauvois, Croix-en-Ternois, Siracourt
Status w eksploatacji
France.jpg

LA VILLE-AUX-BOIS-LÈS-DIZY

Moc znamionowa 8 MW
W eksploatacji od 2016
Lokalizacja La Ville-aux-Bois-Lès-Dizy
Status w eksploatacji
France4.jpg

TERNOIS NORTH

Moc znamionowa 9.2 MW
W eksploatacji od 2012
Lokalizacja Brias, Monchy Breton
Status w eksploatacji