Iserlohn wind project

Iserlohn wind project

ENERTRAG is planning to erect two wind turbines in the outskirts of Iserlohn, between Gerlingsen and Kalthof. Due to the 1,000 m distance regulation to residential areas stipulated in the state development plan, a third wind turbine originally planned is currently not being pursued.

ENERTRAG has been developing the wind farm since mid-2018. In addition to the informal involvement of local politicians, this means in particular carrying out numerous investigations and expert opinions in preparation for the permit application. With the submission of the application for approval, this website has now also been launched to provide ongoing public information on the progress of the project.

The two planned wind turbines will produce more than 33,000 MWh of clean electricity per year. Assuming an average electricity consumption of 3,000 kWh per household per year, around one in four households in Iserlohn will be able to be supplied with locally generated, sustainable energy. The converted electrical energy can also save over 14,500 tons of CO2 annually.

ENERTRAG is thus acting for a clean and secure future for the benefit of the people in the country and future generations on the basis of 100% renewable energies.

karte_nrw_iserlohn.jpg

Opportunity to comment

09/23/2022

The project was published in the official gazette of the Märkischer Kreis on 21.09.2022. Please refer to the official gazette for the deadlines for publication and raising objections. The official gazette can be downloaded from the following link

Download the official gazette of the Märkischer Kreis

2024_ENERTRAG_Joerg_Mueller.jpg
"Sourcing our energy from wind and sun should not be a question of political standpoints, but is the logical consequence of physical, economic and ecological facts."

Jörg Müller

Chairman of the Supervisory Board, founder of ENERTRAG SE, nuclear physicist & engineer

Location and planning area

The planning area is located on private land in the urban area of Iserlohn (Märkischer Kreis, NRW). The project area is located to the north of the Gerlingsen district and to the south-east of the village of Kalthof.

The Iserlohn wind suitability area is suitable for the erection of wind turbines according to regional planning criteria and is therefore designated as a wind energy area in the draft of the "Märkischer Kreis - Kreis Olpe - Siegen-Wittgenstein Spatial Partial Plan" currently being drawn up. The potential study commissioned by the city of Iserlohn also concludes that the area is suitable. The area is also very suitable for the planned project for several other reasons. These include:

  • Good wind conditions for efficient wind energy use
  • Good accessibility thanks to the direct connection to the L678 state road (Dortmunder Straße) and the 46 freeway
  • Good grid connection options
  • Suitable location in terms of noise and shadow impact emissions
  • Source of income to finance the reforestation of the damaged forest area.
Layout_Iserlohn.jpg

Planning status - What has happened so far

A planning concept was initially drawn up in mid-2018 and the optimal locations identified. The noise and shadow impact and the potential energy yield were then evaluated as the project developed.

Since spring 2019, ecoda has been investigating the impact of the planning on the existing avifauna and environmental conditions on behalf of ENERTRAG. In addition to regular mapping of wind energy-sensitive species, specific space utilization analyses were also carried out.

From mid-2020 to mid-2021, a wind measurement campaign was carried out using a mobile LIDAR measuring device. The measurement data helps us to create a valid yield forecast as a basis for the economic evaluation of the project.

The application documents were completed between mid-2021 and mid-2022. Among other things, further expert reports were commissioned and discussions were held with the relevant authorities regarding the scope of the application documents.

Parallel to the planning law process, the parliamentary groups represented on the municipal council were informed about the planning project in an open letter in the early stages and offered discussions.

The parliamentary group "Die Iserlohner" took up the offer of talks. A personal information event was held in the forest area, at which open questions with sometimes controversial views were discussed and openly debated.

Personal discussions were held with the municipal administration at various times over the last few years and the planning project was also presented at these events.

Isophonenkarte_Iserlohn.png

Approval procedure and timetable

The approval procedure in accordance with Section 4 of the Federal Immission Control Act (BImSchG) is carried out in the sponsor procedure. This means that the Märkischer Kreis immission control authority manages the procedure and involves various public interest bodies (TÖB).

These are authorities such as the lower nature conservation authority or the responsible road construction authorities, environmental associations such as NABU or BUND, but also the city of Iserlohn. The city is involved in particular because the procedure sometimes deals with the issue of construction planning law.

In addition to the involvement of the TÖB, there will also be public participation in the course of the approval procedure, where there will be an opportunity to raise objections for or against the project.

All objections raised by the TÖB and the public will then be weighed up by the approval authority. A decision on the application will then be announced by the immission control authority.

We refer all interested citizens to the Märkischer Kreis for all procedural matters. Relevant deadlines, such as the possibility of public participation, are announced in the official gazette.

Current update (as of May 2024): The permit was officially granted on 15.01.2024. As a result, the necessary clearing work was carried out and completed in February 2024. The road construction work will start in fall 2024.

Windpark-Rietz_040.jpg
Windpark-Rietz_040.jpg

We are ENERTRAG

ENERTRAG produces renewable energy in a sustainable way, to keep the Earth habitable. Together. With passion. Energy ahead.

Learn more

Wind energy in the forest

The following images provide an insight into the surroundings of the planned plant locations (as of 2021). Although the area is designated as a forest site (coniferous forest), there are hardly any trees left in the area of the planned sites.

The damage caused by extreme weather phenomena (strong storms and drought-related bark beetle infestation) presents the forestry authorities and landowners with the mammoth task of sustainably restoring the multi-generational forest project in the long term.

Wind energy planning can at least partially remedy this situation. This is due to the decades of financial support as well as the direct measures to sustainably strengthen the areas. Moreover, forestry operations are not restricted by the wind turbines.

The areas used, regardless of whether they have been cleared or, as in Iserlohn, there are no trees left, are reforested in coordination with the specialist authorities at a ratio of at least one to one. Resilient trees are used to create climate-stable forest areas. When the facilities are dismantled at a later date, access roads, parking spaces and the site that are no longer required are also dismantled and reforested to a high standard.

Wind_im_Forst_Iserlohn.jpg

System technology

The 2 Vestas V150-6.0 wind turbines, each with a rated output of 6 MW, have a hub height of 166 m and a rotor diameter of 150 m.

To the product website

Citizen and municipal participation

Participation takes many forms. In addition to public participation within the planning process (see "Approval procedure and timetable"), it is of course also about economic participation. In other words, ensuring that local residents and communities in the vicinity of wind farms benefit appropriately from local wind power generation. The town of Iserlohn benefits directly from the operating company's trade taxes. In addition, ENERTRAG intends to participate in accordance with Section 6 of the German Renewable Energies Act (EEG).

Participation in accordance with Section 6 EEG (Renewable Energies Act)

In the course of the 2021 amendment to the EEG, Section 6 makes it possible to offer municipalities within a radius of 2500 meters of new wind turbines a unilateral grant or financial participation without consideration. The law does not yet apply retroactively to existing wind farms, but only to newly commissioned WTGs. The grant fulfills the following important criteria: It is to be offered voluntarily and is not earmarked for a specific purpose, it is not included in the calculation of the district levy and is paid annually over the entire 20-year EEG term of the WTG. The amount of the payment depends on the annual amount of energy fed into the grid by the WTG. ENERTRAG regularly offers this voluntary contribution to all municipalities in the specific project areas and is also willing to do so in this specific project.

ENERTRAG is planning an annual energy feed-in volume of 33,000 megawatt hours (MWh) for the Iserlohn project. This feed-in quantity multiplied by the amount of EUR 2 per megawatt hour (0.2 cents/kWh) payable under Section 6 of the German Renewable Energy Sources Act (EEG) results in a calculated sum of an estimated EUR 66,000 per year, which in turn will be divided proportionately according to the area of the surrounding communities within a 2.5 km radius of the respective wind turbine and paid to the communities annually for the duration of the operation of the wind turbine.

The worldwide success of ENERTRAG projects

ENERTRAG uses its 30 years of experience worldwide to accelerate the transition to renewable energies.

Lübs-Ferdinandshof wind project

Moc znamionowa 4.5 MW
W eksploatacji od 2016
Lokalizacja Lübs
Status w eksploatacji
Windkraft Uckermark 2024 LR-191.jpg

Penkun wind project

Moc znamionowa 4.2 MW
W eksploatacji od 2018
Lokalizacja Penkun
Status w eksploatacji
Enertrag_Windpark_23 JR_HR-9.jpg

Lüssow-Schmatzin wind project

Moc znamionowa 4.8 - 5.3 MW
W eksploatacji od 2019
Lokalizacja Lüssow
Status planowany
IMG_0684.jpg

Schönfeld project complex

Moc znamionowa 10.5 MW
W eksploatacji od 2020
Lokalizacja Schönfeld
Status w eksploatacji
Koppelsee_bald_IBN.jpg

Mattheshöhe project complex

Moc znamionowa 54.67 MW
W eksploatacji od 2019
Lokalizacja Matteshöhe
Status w eksploatacji
Enertrag DT_Drohne - JEWRO LR-102.jpg

Ramin wind project

Moc znamionowa 33 MW
W eksploatacji od 2027
Lokalizacja Ramin
Status planowany
geplante_Windenergieanlage.jpeg

Rosow community energy project

Moc znamionowa 20.7 MW
W eksploatacji od 2020
Lokalizacja Rosow
Status w eksploatacji
News_Service.jpg

Dauer project complex

Moc znamionowa 27.43 MW
W eksploatacji od 2015
Lokalizacja Duration
Status w eksploatacji
Windkraft Uckermark 2024 LR-18.jpg

Kassow wind project

Moc znamionowa 5.7 MW
W eksploatacji od
Lokalizacja Kassow
Status w budowie
Enertrag_Windpark_23 JR_HR-219.jpg

Bonnhagen I wind project

Moc znamionowa 24 MW
W eksploatacji od 2025
Lokalizacja Bonnhagen
Status w budowie
Lageplan_Ramelsloh_2022.jpeg

Ramelsloh wind project

Moc znamionowa 4.2 MW
W eksploatacji od 2023
Lokalizacja Ramelsloh
Status w eksploatacji
geplante_Windenergieanlage.jpeg

Iserlohn wind project

Moc znamionowa 12 MW
W eksploatacji od 2025
Lokalizacja Iserlohn
Status w budowie
Wald_Westerwald.jpg

Westerwald II wind project

Moc znamionowa 34.2 MW
W eksploatacji od 2028
Lokalizacja Hauser Forest
Status planowany
nordkirchen.jpg

Nordkirchen wind project

Moc znamionowa 14.1 MW
W eksploatacji od 2027
Lokalizacja Nordkirchen
Status planowany
geplante_Windenergieanlage.jpeg

Anklam combined cycle power plant

Moc znamionowa 240 MW electrolysis
W eksploatacji od 2024
Lokalizacja Anklam
Status planowany
Chemin de Tuleras.1.jpg

CHEMIN DE TULERAS

Moc znamionowa 12 MW
W eksploatacji od 2006
Lokalizacja Villemeux, Boulay-Thierry
Status w eksploatacji
France4.jpg

SAINT-ANDRÉ-FARIVILLERS

Moc znamionowa 11.5 MW
W eksploatacji od 2008
Lokalizacja Saint-André-Farivillers
Status w eksploatacji
Campremy-20.jpg

CAMPREMY-BONVILLERS

Moc znamionowa 11.5 MW
W eksploatacji od 2011
Lokalizacja Campremy, Bonvillers
Status w eksploatacji
France.jpg

CHEMIN-BLANC

Moc znamionowa 12 MW
W eksploatacji od 2012
Lokalizacja Francastel
Status w eksploatacji
Campremy-20.jpg

DEMI-LIEUE

Moc znamionowa 12 MW
W eksploatacji od 2011
Lokalizacja Crèvecoeur le Grand, Viefvilliers
Status w eksploatacji
ENERTRAG_-Construction-Levage-sizing.jpg

ROINVILLE

Moc znamionowa 8 MW
W eksploatacji od 2006
Lokalizacja Roinville
Status w eksploatacji
France4.jpg

ORESMAUX

Moc znamionowa 12 MW
W eksploatacji od 2008
Lokalizacja Oresmaux
Status w eksploatacji
France3.jpg

FRESNOY-AU-VAL

Moc znamionowa 10 MW
W eksploatacji od 2013
Lokalizacja Fresnoy, Bougainville
Status w eksploatacji
France4.jpg

BOUGAINVILLE

Moc znamionowa 12 MW
W eksploatacji od 2005
Lokalizacja Bougainville
Status w eksploatacji
Campremy-20.jpg

CAIX

Moc znamionowa 12 MW
W eksploatacji od 2013
Lokalizacja Caix
Status w eksploatacji
France4.jpg

LIANCOURT

Moc znamionowa 7 MW
W eksploatacji od 2017
Lokalizacja Liancourt- Fosse
Status w eksploatacji
France.jpg

REMIGNY-LY-FONTAINE

Moc znamionowa 18.4 MW
W eksploatacji od 2015
Lokalizacja Rémigny, Ly-Fontaine
Status w eksploatacji
Campremy-20.jpg

LA BRIE CHAMPENOISE

Moc znamionowa 20 MW
W eksploatacji od 2015
Lokalizacja Corfélix, La Villeneuve les Charleville, Charleville
Status w eksploatacji
ENERTRAG_-Construction-Levage-sizing.jpg

ANGUILCOURT

Moc znamionowa 12 MW
W eksploatacji od 2016
Lokalizacja Anguilcourt, Brissay-Choigny
Status w eksploatacji
France.jpg

SISSY-MÉZIERES

Moc znamionowa 10 MW
W eksploatacji od 2017
Lokalizacja Sissy, Châtillon-sur-Oise, Mézières
Status w eksploatacji
France4.jpg

SOUTH TERNOIS

Moc znamionowa 13.8 MW
W eksploatacji od 2011
Lokalizacja Croisette, Héricourt, Hauteclocque
Status w eksploatacji
France3.jpg

EAST TERNOIS

Moc znamionowa 11.5 MW
W eksploatacji od 2011
Lokalizacja Ligny Saint Flochel
Status w eksploatacji
ENERTRAG_-Construction-Levage-sizing.jpg

CROISETTE I

Moc znamionowa 12 MW
W eksploatacji od 2015
Lokalizacja Croisette
Status w eksploatacji
France3.jpg

CROISETTE II

Moc znamionowa 5 MW
W eksploatacji od 2015
Lokalizacja Beauvois, Croix-en-Ternois, Siracourt
Status w eksploatacji
France.jpg

LA VILLE-AUX-BOIS-LÈS-DIZY

Moc znamionowa 8 MW
W eksploatacji od 2016
Lokalizacja La Ville-aux-Bois-Lès-Dizy
Status w eksploatacji
France4.jpg

TERNOIS NORTH

Moc znamionowa 9.2 MW
W eksploatacji od 2012
Lokalizacja Brias, Monchy Breton
Status w eksploatacji

Contact

Fields
Cloudflare Turnstile Captcha

Further information on the processing of your personal data can be found in our privacy notice.