Przejdź do treści

Reference power plant Lausitz

Real-world laboratories of the energy transition funding program

Mission

At the Schwarze Pumpe Industrial Park site, the innovative power plant concept, which utilises exclusively renewable energies such as wind power and photovoltaic systems, will demonstrate the possibilities of sector coupling. The production of green hydrogen, which enables the utilisation of renewably generated energy in the transport, industry and heating sectors, is an important step towards reducing dependence on fossil fuels.

In addition, the project of the partners Energiequelle, ENERTRAG and Zweckverband Industriepark Schwarze Pumpe will open up new value creation potential for the region and will serve as a reference for the conversion of conventional power plant sites to renewable energy generation.

Project profile
Location: 
Spreetal (Schwarze Pumpe)
Power class: 
12 MW (min. 30 MW possible)
Commissioning: 
Q1/2026
H2 volumes: 
1,000 t/a (2,500+ t/a) 
Delivery concept: 
Trailer and gas grid blending from 2026, local refueling, perspective Lausitz pipeline (H2)
"Since its foundation, ENERTRAG has seen hydrogen as an essential building block for a successful energy transition. With the RefLau, we will show that the generation of renewable electricity can be stabilised and that Lusatia can become a model region for successful structural change."

Dr. Gunar Hering

CEO ENERTRAG SE

Enertrag DT_Drohne - JEWRO LR-58.jpg
Enertrag DT_Drohne - JEWRO LR-58.jpg
Enertrag DT_Drohne - JEWRO LR-58.jpg
Enertrag DT_Drohne - JEWRO LR-58.jpg

About ENERTRAG

As an independent energy company, ENERTRAG generates electricity and heat exclusively from renewable sources and supplies secure, affordable renewable energy for all areas of life. With over 30 years of experience, ENERTRAG combines all the expertise required for successful operation and efficient maintenance, for citizen-centered planning, reliable construction of energy plants and grids through to complete integrated power plants. 

Learn more

Flagship projects

The goal: 100 percent fossil-free – worldwide. To achieve this, ENERTRAG is turning pioneering ideas into sustainable, viable solutions.

ETAPA 4 ZONA 1-2_Moment2.jpg

Hyphen: Project for green hydrogen in Namibia

Moc znamionowa 3.5 GW
W eksploatacji od
Lokalizacja Namibia
Status TBA
ENERTRAG_Spatenstich_Elektrolyseur_Osterweddingen_20240513v4.jpg

Osterweddingen hydrogen plant

Moc znamionowa 10 MW
W eksploatacji od 2025
Lokalizacja Osterweddingen
Status w budowie
PV Uckermark_ Enertrag LR-36.jpg

PV field Kreuz Uckermark

Moc znamionowa 20 MW
W eksploatacji od 2023
Lokalizacja Gramzow
Status w eksploatacji
Bild3.png

Battery storage Tantow

Moc znamionowa 60 MW / 120 MWh
W eksploatacji od 2026
Lokalizacja Tantow
Status planowany
Enertrag_Windpark_23 JR_HR-217.jpg

Wind farm Dunowo, Poland

Moc znamionowa 186 MW
W eksploatacji od
Lokalizacja Poland
Status w eksploatacji
Visualisierung_Pasewalk_resized_sharpened.png

Verbundkraftwerk Pasewalk

Moc znamionowa 60 MW
W eksploatacji od 2029
Lokalizacja Pasewalk
Status planowany
Header_Projektwebsite_VKW_Anklam.jpg

Verbundkraftwerk Anklam

Moc znamionowa 240 MW
W eksploatacji od 2029
Lokalizacja Anklam
Status planowany

Electrolysis Plant Prenzlau Nord

Moc znamionowa 130 MW
W eksploatacji od 2029
Lokalizacja Prenzlau North
Status planowany

Reference power plant Lausitz

Moc znamionowa 12 MW
W eksploatacji od
Lokalizacja Lusatia
Status planowany

Concrete Chemicals

Moc znamionowa 35 kt/a SAF
W eksploatacji od 2028
Lokalizacja Rüdersdorf
Status planowany

Heidekrautbahn

Moc znamionowa 4 MW
W eksploatacji od
Lokalizacja Oberhavel (Oranienburg)
Status w budowie
Tambores_15_-_Foto_600.png

Tambor: E-methanol from green hydrogen

Moc znamionowa 350 MW
W eksploatacji od
Lokalizacja Uruguay
Status planowany

News

Stay up to date with the latest articles from the press area

Contact

Fields
Cloudflare Turnstile Captcha

Further information on the processing of your personal data can be found in our privacy notice.