The Croisette I wind farm, commissioned in 2015 and located in the Hauts-de-France region, comprises 4 Siemens wind turbines with a total capacity of 12 MW.
"We generate renewable energy sustainably so that the earth remains liveable. That is our mission. On this path, we want to completely replace fossil fuels by 2040."
Jörg Müller
Founder and Chairman of the Supervisory Board ENERTRAG SE
ENERTRAG produces renewable energy in a sustainable way, to keep the Earth habitable. Together. With passion. Energy ahead.
ENERTRAG uses its 30 years of experience worldwide to accelerate the transition to renewable energies.
CHEMIN DE TULERAS
SAINT-ANDRÉ-FARIVILLERS
CAMPREMY-BONVILLERS
CHEMIN-BLANC
DEMI-LIEUE
ROINVILLE
ORESMAUX
FRESNOY-AU-VAL
BOUGAINVILLE
LIANCOURT
REMIGNY-LY-FONTAINE
LA BRIE CHAMPENOISE
The Anguilcourt wind farm, commissioned in 2016 and located in the Hauts-de-France region, comprises 6 Senvion wind turbines with a total output of 12 MW.
SISSY-MÉZIERES
SOUTH TERNOIS
TERNOIS EST
CROISETTE I
LA VILLE-AUX-BOIS-LÈS-DIZY
CROISETTE II
TERNOIS NORTH
Anklam combined cycle power plant
ENERTRAG is planning to erect three wind turbines on the outskirts of the municipality of Nordkirchen, on Münsterstrasse at Meinhövels Holz/Piekenbrock and to the west of the district of Cap...
ENERTRAG SE is planning to erect a total of six wind turbines in the Hauser Wald forest in Hesse on the border with Rhineland-Palatinate, located between the municipalities of Dornburg, Wald...
ENERTRAG is planning to erect two wind turbines in the outskirts of Iserlohn, between Gerlingsen and Kalthof. Due to the 1,000 m distance regulation to residential areas stipulated in the st...
ENERTRAG SE is planning the construction and operation of a 4 MW class wind turbine in Ramelsloh in the municipality of Seevetal. The planned and approved turbine is a VESTAS V150 with an ou...
ENERTRAG SE is planning a new, regionally significant energy project for which a separate approval procedure will be carried out. The following pages provide transparent information in this ...
ENERTRAG has been planning a new, regionally significant energy project for several years, for which a separate approval procedure with public participation is being carried out. In this con...
The “Dauer III” and “Dauer IV” wind project is located in the north-east of Brandenburg, east of the Prenzlau district of Dauer. The environmentally friendly construction and operation of th...
ENERTRAG Windfeld Schönfeld III GmbH & Co. KG plans to operate 5 Vestas V117 wind turbines, each with a rated output of 3.45 MW and a total capacity of 17.25 MW, known as the Rosow wind fiel...
ENERTRAG has been planning a wind field north-east of Ramin for several years, for which a separate approval procedure with public participation is to be carried out. The following pages are...
Bürgerwind Matteshöhe UG & Co. KG operates 4 GE 3.6-137 wind turbines with 3.63 MW and a total installed capacity of 14.52 MW in the municipalities of Uckerfelde and Grünow (Brandenburg).
Bürgerwind Schönfeld UG & Co. KG initially plans to operate two Vestas V117 wind turbines, each with a rated output of 3.45 MW and a total capacity of 6.9 MW, known as the Schönfeld III proj...
ENERTRAG, wpd and naturwind are planning a new, regionally significant energy project for which a separate approval procedure with public participation will be carried out. The following pag...
ENERTRAG has been planning a wind field south of Penkun for several years, for which a separate approval procedure with public participation is to be carried out. In this context, transparen...
ENERTRAG has been planning a new, regionally significant energy project for several years, for which a separate approval procedure with public participation is to be carried out. Transparent...
I consent to the processing of my personal data in accordance with the privacy policy. I have read and understood the privacy policy