Repowering with ENERTRAG

Proven location. New wind turbines.

Modern wind turbines generate a higher electricity yield, secure long-term income and advance the energy transition in your region. Find out how repowering can make your sites fit for the future.

What is repowering?

Older wind turbines are replaced by modern turbines. This increases the electricity yield, secures long-term income and continues to use existing sites for the future.

Repowering leads to ...

  • higher energy yields
  • more efficient use of space
  • better economic efficiency thanks to modern technology
  • often fewer wind turbines in the wind farm
  • added value that remains in the region
  • improved grid integration thanks to grid-friendly new wind turbines
  • an effective contribution to climate protection
Repowering extra Foto.jpg

What are the advantages of repowering?

Modern wind turbines are more reliable, more grid-friendly and require significantly less maintenance than older models. They supply more electricity from the same area and therefore increase the profitability of the entire wind farm. For you, this means predictable yields and stable calculations.

Repowering creates long-term operational and yield security for existing parks that have reached their technical or economic limits. ENERTRAG works with you to develop cooperation models so that you can continue to expect predictable income in the future.

ENERTRAG organizes the entire dismantling process - from dismantling to recycling. Are you planning to sell your plant? Here too, we offer solutions and are at your side as a reliable partner.

Repowering increases the output of the wind farm – and the municipality's income. In the long term, higher trade tax revenues and municipal taxes strengthen the budget; new projects can bring additional orders for regional companies. Repowering thus contributes directly to local economic development – which can also lead to greater acceptance among the population.

For landowners, repowering means long-term security. Attractive lease models and long-term partnerships ensure stable and often higher income. The usually lower number of turbines and optimized use of infrastructure means that parts of the former wind farm areas can be returned to agricultural use.

The repowering process with ENERTRAG

We start with a free potential analysis and check existing wind turbines for their repowering capability. This includes checking the eligibility for approval of new turbines and, for example, the availability of land and the economic potential. Together with you, we develop the right path to your successful repowering.


 

Step 1: Site analysis

We evaluate the existing wind farm technically, economically and in terms of licensing law. This enables us to identify potential at an early stage and develop individual measures to make the wind farm more efficient and profitable.

Step 2: Securing land

We conclude new licensing agreements with the landowners and acquire the old existing wind farm if required.

Step 3: Planning & approval

We create a tailor-made concept that takes all regulatory requirements into account. We use our experience to ensure that the procedures are transparent and efficient.

Step 4: Dismantling & new construction

Development of a customized repowering concept, taking into account all legal requirements. The old turbines are safely dismantled and professionally recycled and disposed of. At the same time, we erect the new, more powerful turbines. In this way, we ensure short transition periods and a rapid resumption of electricity production.

Step 5: Commissioning & monitoring

Once the system has been handed over, we continuously monitor its performance, secure long-term yields and support you at all times with our service and maintenance services.

From old to efficient - rock'n roll in the wind farm with ENERTRAG

How existing wind sites can be efficiently renewed with modern technology: more electricity yield, fewer turbines, lower costs and maximum benefits for operators, investors and the energy transition.

Why ENERTRAG?

>
25
years
Expertise in renewable energies
>
1200
employees
945
MW
of wind in own portfolio
1,7
TWh
of annual electricity production in our own portfolio

Success stories

Windpark Bütow.jpg

 

Bütow wind farm

 

 ExistingNew wind farm
Turbine type:DeWind D4-48Nordex N163
Number of turbines:96
Total installed capacity:5.4 MW42 MW
Commissioning:1999 & 20012026
Yield factor113,3
repowering_1.jpg

 

Roitzsch wind farm

 

 ExistingNew wind farm
Turbine type:DeWind D4-48Vestas V150-6.0
Number of turbines:42
Total installed capacity:2.4 MW12 MW
Commissioning:19992025
Yield factor18

Please do not hesitate to contact us:

_EE_6523 (1).jpg

Katja Gall
Team leader
Phone +49 39854 6459-5311
E-mail: repowering@enertrag.com

_R1_0795 (1).jpg

Lena Weische
Project manager
Phone +49 39854 6459-5045
E-mail: repowering@enertrag.com

What you should bring to the interview:

Our checklist will help you to assess whether repowering could make sense for you:

  • Site information (location, area)
  • Current key figures on energy generation
  • Overview of existing turbines (year of construction, type, output)
  • Contract details (e.g. terms)
  • Information on any restrictions (construction height, species protection)

Contact

Fields
Cloudflare Turnstile Captcha

Further information on the processing of your personal data can be found in our privacy notice.

Ausgewählte Projekte

ENERTRAG realisiert Projekte, die international die Weichen zu fossilfreier Energieversorgung stellen und setzt mit Leuchtturmprojekten visionäre Ideen in tragfähige, wirtschaftliche Lösungen um. 

Enertrag DT_Drohne - JEWRO LR-56.jpg

Wind farm Sonnenberg Repowering

Nominal Power 197,2 MW
Operating Since 2029
Location Oschersleben
Status planned
ENERTRAG_Spatenstich_Elektrolyseur_Osterweddingen_20240513v4.jpg

Osterweddingen hydrogen plant

Nominal Power 10 MW
Operating Since 2026
Location Osterweddingen
Status under construction
PV Uckermark_ Enertrag LR-36.jpg

PV field Kreuz Uckermark

Nominal Power 20 MW
Operating Since 2023
Location Gramzow
Status in operation
Bild3.png

Battery storage Tantow

Nominal Power 60 MW / 120 MWh
Operating Since 2026
Location Tantow
Status planned
ETAPA 4 ZONA 1-2_Moment2.jpg

Hyphen: Project for green hydrogen in Namibia

Nominal Power 3.5 GW
Operating Since
Location Namibia
Status TBA
Enertrag_Windpark_23 JR_HR-217.jpg

Wind farm Dunowo, Poland

Nominal Power 186 MW
Operating Since
Location Poland
Status in operation
Header_Concrete_Chemicals_2026.jpg

Concrete Chemicals

Nominal Power 35,000 t/a eSAF
Operating Since 2030
Location Brandenburg
Status planned
Visualisierung_Pasewalk_resized_sharpened.png

Verbundkraftwerk Pasewalk

Nominal Power 60 MW
Operating Since 2029
Location Pasewalk
Status planned
Header_Projektwebsite_VKW_Anklam.jpg

Verbundkraftwerk Anklam

Nominal Power 240 MW
Operating Since 2029
Location Anklam
Status planned

Electrolysis Plant Prenzlau Nord

Nominal Power 130 MW
Operating Since 2029
Location Prenzlau North
Status planned

Heidekrautbahn

Nominal Power 4 MW
Operating Since 2026
Location Oberhavel (Oranienburg)
Status under construction
ENERTRAG_Bertikow_3DComp_vorabversion.png

Bertikow battery storage system

Nominal Power 200 MW
Operating Since 2027
Location Bertikow
Status planned
ElleryStudio-Enertrag-GFL-Perspective-e05-Asphalt-crop.jpg

Green Fuels Lausitz

Nominal Power 280 MW
Operating Since 2031
Location Lausitz
Status planned
Wiesenau hero.jpg

Windpark Wiesenau

Nominal Power 50,4 MW
Operating Since
Location Oschersleben
Status planned