Enertrag_Service_27.JPG

Service, maintenance, repair

Prevent downtime: Customized maintenance and servicing. 

Downtime prevention, consistent operation

ENERTRAG Service guarantees your wind turbine operates efficiently. It offers an end-to-end solution of servicing, maintenance and repair. With 16 service points in Germany and bases in France, Poland and South Africa, ENERTRAG Service provides support for wind turbines from start to finish.

Our services at a glance:

  • Remote data monitoring and troubleshooting 24/7
  • Flexible contracts
  • Large component replacement
  • Servicing to manufacturers’ specifications
  • Non-destructive material testing
  • Welding repairs, DIN EN ISO 3834-2 certified
  • 16 service points and bases in Europe
  • A well-stocked warehouse of spare parts and large components
  • Safe and eco-friendly turbine dismantling
  • Reliable and professional HSE management
  • With the following certification: ISO 45001:2018, ISO 9001:2015, ISO 14001:2015

Fast. Simple. Manufacturer-independent: ENERTRAG Service ensures the economical operation of wind turbines and offers end-to-end solution of servicing, maintenance and repair.

16
service stations in Germany and bases in France, Poland and South Africa
5000
+
items in stock ready to ship
24/7
remote data monitoring with troubleshooting

ENERTRAG Service locations in Germany

MAP_ENE_SERVICE_EN.jpg

Large component replacement worldwide 

The ENERTRAG Service team replaces main and yaw gears, rotor bearings and generators flexibly and reliably, worldwide. In addition, there is the inspection of main components, assistance in optimising the service life of major components and demand-oriented warehousing of major components. The assessment of components is carried out together with insurance companies and appraisers at the plant or in the workshop. 

S._4.JPG

Non-destructive testing of materials 

ENERTRAG Service tests components and material in its own workshop and on the wind turbine with certified welding department. This means that parts can be used directly afterwards, resulting in less effort and lower costs. 

Enertrag_Windpark_23 JR_HR-85.jpg
Kachel_Ersatzteile.jpg
Kachel_Ersatzteile.jpg

Spare parts and stock items

ENERTRAG Service keeps spare parts in stock and ships worldwide. Thanks to having its own warehouses at several locations, ENERTRAG Service can rectify faults quickly and cost-effectively. The technical support team quickly determines which spare parts are the right ones, procures them and delivers them. Find the right articles here.  

Dismantling 

ENERTRAG dismantles old systems and takes care of their proper disposal. Appropriate proof is provided that the plant has been recycled in an environmentally friendly manner and that the materials have been returned to the material cycle.

service-kachel_1_5.jpg

Benefits 

  • Flexible contracts 
  • Large component replacement 
  • Servicing according to manufacturer specifications 
  • Non-destructive material testing 
  • Welding repairs, DIN EN ISO 3834-2 certified 
  • Extensive stock of spare parts and large components 
  • Reliable and professional HSE management 
  • Certified according to: ISO 45001:2018, ISO 9001:2015, ISO 14001:2015 

 

Andrea Vogt_8.jpg
Andrea Vogt_8.jpg

Apply now as a service technician

ENERTRAG Service brochure

Operate wind turbines profitably and avoid downtimes. Download the brochure now for detailed information. 

Certified quality

Certified quality management system DIN EN ISO 9001: 2015 
Certified environmental management system DIN EN ISO 14001:2015 
Certified occupational health and safety management system DIN EN ISO 45001: 2018 
Certified according to welding repairs DIN EN ISO 3834-2
Certified according to new construction of steel structures DIN EN ISO 1090-1 
Regular safety instructions GWO standard 

Contact

Fields

I consent to the processing of my personal data in accordance with the privacy policy. I have read and understood the privacy policy. Privacy policy

Kachel_Aussicht.jpg

ENERTRAG utilises electricity from wind and solar power as well as green hydrogen to create modern renewable power plants that supply people and regions.

News

Stay up to date with the latest articles from the press area. 

Repowering Roitzsch

ENERTRAG and Ingka Investments to explore repowering in Germany

Meeting von N-ENERGIE und Powersystem (PY) von ENERTRAG auf der Hamburg WindEnergy 2024

N-ERGIE relies on ENERTRAG: Partnership for the use of the power system for technical operations management and 24/7 monitoring

Procurement reforms critical to accelerating SA's renewable energy rollout

ENERTRAG und Stadt Prenzlau schließen Verträge zur finanziellen Beteiligung an Windenergieanlagen.JPG

ENERTRAG and the town of Prenzlau conclude contracts for financial participation in wind turbines

Enos-Banda-1-1024x684.jpg

ENERTRAG Announces Appointment of Enos Banda as CEO of its South African business

Kooperation_EAG_EQ_Cottbus_02092024-4.jpg

Zwei Energiewende-Pioniere bündeln ihre Kräfte: Gründung der „Grünstrom Lausitz GmbH“

Clinton Carter-Brown.jpg

Connecting to a constrained grid

HH_Bueroeroeffnung_Gruppenbild_Laeisz_Dressel_Hering_240923-ENERTRAG_1371.jpg

ENERTRAG opens office in Hamburg: New momentum for green hydrogen economy

ENERTRAG Expands Its Management Board with a New Position

HiShiFT.jpg

Empowering women in energy: A step towards transforming leadership in South Africa

ENERTRAG South Africa's commitment to societal development and sustainable energy transition

Wasserstofftank

ENERTRAG joins aireg as a member

15.7.2024-Förderbescheidübergabe IPCEI Wasserstoff-019.JPG

Handover of the funding notification for the ENERTRAG project "Electrolysis Corridor East Germany"

Enertrag DT_Drohne - JEWRO LR-98_web.jpg

ENERTRAG celebrates record year 2023/24 in project development

Tom Lange, Reimar von Wachholtz (beide ENERTRAG), Tobias Goldschmidt (Energiewendeminister Schleswig-Holstein), Jörn Genoux (Leiter Referat für Wirtschaft der Stadt Kiel)

ENERTRAG eröffnet neues Büro in Kiel

ENERTRAG commissions first wind turbine in Lower Saxony

Bureau-Lyon-OK-980x794.jpg

Ouverture d’une nouvelle agence

ENERTRAG secures medium-term investment loan to finance growth

Ground-breaking ceremony for electrolyser at Osterweddingen Industrial Park

Verbundkraftwerk Anklam: A milestone for sustainable energy and regional growth

Hyphen hydrogen project in Namibia on the way to becoming a strategic foreign project of the Federal Republic of Germany

3D_Visualisierung_Elektrolyseur.jpg

EU Commission approves funding for the ENERTRAG project "Electrolysis Corridor East Germany"

hyphen.png

Fraunhofer IWES is setting new standards in onshore numerical site assessment in Namibia

ENERTRAG_TBN_2024.jpg

ENERTRAG appoints Dr. Tobias Bischof-Niemz as Member of the Management Board for Projects International & Technology

DSC03289_Kopie.jpg

ENERTRAG-Projekte Hyphen und HyShift auf der COP28 als "Energy Transition Changemakers" ausgezeichnet

2023-10-06_Kellner_TSV3847_fx_Tom-Schweers_kl.jpg

Transformationspfad für die neuen Gase: Staatssekretär Kellner besucht gemeinsam mit Verbänden ENERTRAG-Hybridkraftwerk

Gunar_Hering_ENERTRAG_Energiemanager_des_Jahres_2022.jpg

Energiemanager des Jahres 2022: Dr. Gunar Hering

Inbetriebnahme_Kassow.jpg

Windenergieanlage in Kassow offiziell in Betrieb genommen

Visuel-pour-article-Site-Enertrag-1-1-843x675.png

ENER’MAG n°20

398A3580.jpeg

ENERTRAG und Landkreis Prignitz setzen weiteren Meilenstein für die Wasserstoff-Strategie in Brandenburg

Umspannwerk_Bertikow.jpg

Erneuerbare Energien sichern Netzstabilität: 50Hertz und ENERTRAG starten Pilotprojekt zur Spannungshaltung

ENERTRAG_SE_Bildmaterial_Solarpark_Kreuz_Uckermark.jpeg

Full (solar) power ahead: ENERTRAG Operation takes over operations management of 20 MW large-scale photovoltaic project

Hyphen_Signing_Namibia_May_2023.jpeg

Namibias Regierung unterzeichnet 10-Milliarden-US-Dollar-Vereinbarung für grünes Wasserstoffprojekt mit Hyphen Hydrogen Energy

hyphen.png

Hyphen-Projekt von namibischer Regierung genehmigt

Büroeröffnung.jpg

ENERTRAG eröffnet neues Büro in Dortmund

PV_Kreuz_Uckermark.png

ENERTRAG nimmt 20 MW Solarfeld mit 3,4 MWh Speicher am Kreuz Uckermark in Betrieb

HyPE__PCK_Enertrag_Pressegespraech_8_Mai_2023.jpg

PCK Raffinerie Schwedt und ENERTRAG stellen Transformationspfad vor

20230419_Bueroeroeffnung_Cottbus_Redner.jpg

ENERTRAG eröffnet neuen Standort in Cottbus

Dr._Gunar_Hering.png

Dr. Gunar Hering ist „Energiemanager des Jahres 2022“

Index de l’égalité professionnelle 2023

NEA-HOFER_Membrankompressor_MKZ_Copyright_NEUMANN___ESSER.jpg

Grüner Wasserstoff für Industriepark bei Magdeburg

ENERTRAG_Hybridkraftwerk_Prenzlau_Wasserstoff.jpg

ENERTRAG selects Elogen for the delivery of a 10 MW PEM electrolyser

Drohneninspektion_7_Jewgeni Roppel.jpg

Right in time for operators: ENERTRAG Operation offers drone inspection in France by 2023

PRESSEMITTEILUNG_ENERTRAG_Betrieb_bietet_Sicherheitspruefungen_an.jpg

ENERTRAG Betrieb erweitert mit Sicherheitsprüfungen das Dienstleistungsportfolio

2022-09-22_Enertrag_Service.jpg

ENERTRAG Service erfolgreich zertifiziert

PRESSEMITTEILUNG_ENERTRAG_Betrieb_bietet_Drohneninspektion_in_Frankreich_an_Website1.jpg

ENERTRAG Operation offers drone inspection as a licence model by 2023

2022-09-19-Dunowo.jpg

ENERTRAG inaugurates 186 MW Dunowo wind project in Poland

Interview-Marie-e1658927788739.png

Portrait de Marie : Cheffe de Projet éolien

2022-07-14_SW_Malchow.jpg

ENERTRAG & Stadtwerke Malchow bieten Windkraftbonus in Bütow an

2022-07_PRESSEMITTEILUNG_Inspektionsstelle_von_ENERTRAG_Betrieb_re-akkreditiert_2-1.jpg

Qualität bestätigt: Überwachungsaudit der Akkreditierung von ENERTRAG Betriebs Inspektionsstelle der DAkkS erfolgreich durchlaufen