03/06/2020
The dismantling work on temporary access roads is still in full swing.
This week, the temporary access road at the B113 junction was dismantled, among other things.
Bürgerwind Schönfeld UG & Co KG initially plans to operate two Vestas V117 wind turbines, each with a rated output of 3.45 MW and a total capacity of 6.9 MW, known as the Schönfeld III project. An extension with the SD Z3 wind turbine of type Vestas V136 and a nominal output of 3.6 MW is planned at a later date and the corresponding application for approval has already been submitted.
"With the ENERTRAG Verbundkraftwerk®, we are bringing structure into energy transition: Many decentralised modules function like a single large, 100 % renewable power plant."
Dr. Tobias Bischof-Niemz
ENERTRAG Board Member Projects International & Technology
The Schönfeld III wind field is located in the municipality of Tantow in the district of Uckermark in the north of Brandenburg. The planned wind turbine sites are located to the west of the village of Schönfeld on agricultural land.
Bürgerwind Schönfeld UG & Co KG is initially planning 2 Vestas V117 wind turbines, called Project Schönfeld III.
ENERTRAG produces renewable energy in a sustainable way, to keep the Earth habitable. Together. With passion. Energy ahead.
The planned 2 Vestas V117 wind turbines with a rated output of 3.45 MW and a total installed capacity of 6.9 MW have a hub height of 141.5 m and a rotor diameter of 117 m.
To the Vestas V117 product website
ENERTRAG uses its 30 years of experience worldwide to accelerate the transition to renewable energies.
ENERTRAG has been planning a new, regionally significant energy project for several years, for which a separate approval procedure with public participation is to be carried out. Transparent...
ENERTRAG has been planning a wind field south of Penkun for several years, for which a separate approval procedure with public participation is to be carried out. In this context, transparen...
ENERTRAG, wpd and naturwind are planning a new, regionally significant energy project for which a separate approval procedure with public participation will be carried out. The following pag...
Bürgerwind Schönfeld UG & Co. KG initially plans to operate two Vestas V117 wind turbines, each with a rated output of 3.45 MW and a total capacity of 6.9 MW, known as the Schönfeld III proj...
Bürgerwind Matteshöhe UG & Co. KG operates 4 GE 3.6-137 wind turbines with 3.63 MW and a total installed capacity of 14.52 MW in the municipalities of Uckerfelde and Grünow (Brandenburg).
ENERTRAG has been planning a wind field north-east of Ramin for several years, for which a separate approval procedure with public participation is to be carried out. The following pages are...
ENERTRAG Windfeld Schönfeld III GmbH & Co. KG plans to operate 5 Vestas V117 wind turbines, each with a rated output of 3.45 MW and a total capacity of 17.25 MW, known as the Rosow wind fiel...
The “Dauer III” and “Dauer IV” wind project is located in the north-east of Brandenburg, east of the Prenzlau district of Dauer. The environmentally friendly construction and operation of th...
ENERTRAG has been planning a new, regionally significant energy project for several years, for which a separate approval procedure with public participation is being carried out. In this con...
ENERTRAG SE is planning a new, regionally significant energy project for which a separate approval procedure will be carried out. The following pages provide transparent information in this ...
ENERTRAG SE is planning the construction and operation of a 4 MW class wind turbine in Ramelsloh in the municipality of Seevetal. The planned and approved turbine is a VESTAS V150 with an ou...
ENERTRAG is planning to erect two wind turbines in the outskirts of Iserlohn, between Gerlingsen and Kalthof. Due to the 1,000 m distance regulation to residential areas stipulated in the st...
ENERTRAG SE is planning to erect a total of six wind turbines in the Hauser Wald forest in Hesse on the border with Rhineland-Palatinate, located between the municipalities of Dornburg, Wald...
ENERTRAG is planning to erect three wind turbines on the outskirts of the municipality of Nordkirchen, on Münsterstrasse at Meinhövels Holz/Piekenbrock and to the west of the district of Cap...
Anklam combined cycle power plant
CHEMIN DE TULERAS
SAINT-ANDRÉ-FARIVILLERS
CAMPREMY-BONVILLERS
CHEMIN-BLANC
DEMI-LIEUE
ROINVILLE
ORESMAUX
FRESNOY-AU-VAL
BOUGAINVILLE
LIANCOURT
REMIGNY-LY-FONTAINE
LA BRIE CHAMPENOISE
The Anguilcourt wind farm, commissioned in 2016 and located in the Hauts-de-France region, comprises 6 Senvion wind turbines with a total output of 12 MW.
SISSY-MÉZIERES
SOUTH TERNOIS
TERNOIS EST
CROISETTE I
CROISETTE II
LA VILLE-AUX-BOIS-LÈS-DIZY
TERNOIS NORTH
Further information on the processing of your personal data can be found in our privacy notice.