Ramin wind project

Ramin wind project

ENERTRAG has been operating a wind field north-east of Ramin for several years, for which a separate approval procedure with public participation is being carried out. The following pages are intended to provide transparent information in this context.

In addition to the environmentally friendly construction and operation of 6 powerful wind turbines, the main focus is on the participation of local citizens and communities and thus on an important project in the concrete implementation of the energy transition in the Vorpommern region.

The 6 planned wind turbines produce more than 84,000,000 kWh of clean electricity per year and can therefore supply around 28,000 households with green energy, assuming an average electricity consumption of 3,000 kWh per household per year. The electricity produced can also save almost 40,000 tons of CO2 annually.

ENERTRAG is thus acting for a clean and secure future for the benefit of the people in the country and future generations on the basis of 100% renewable energies.

Application documents officially submitted and official participation started

12/15/2020

Further information events are being planned

news.jpg

 

In November, after a long period of planning and intensive coordination with the approval authority, the application documents for the approval application in accordance with the Federal Immission Control Act for the wind turbines in the municipality of Ramin were submitted. In December, the State Office for Agriculture and the Environment began involving the authorities.

ENERTRAG plans to hold further information events on site to provide information on the current status and the next steps in the approval process. Unfortunately, no public events can be held due to the current situation. However, if you have any questions or suggestions, please do not hesitate to contact us.

You can reach us on the free hotline

0800 39 200 30

(Mon - Fri from 8.00 - 12.00 and 13.30 - 15.30).

In particular, we wish you good health for the difficult times ahead!

"Together, we will overcome fossil fuels. ENERTRAG has the potential to completely replace conventional power plants."

Dr. Gunar Hering

CEO ENERTRAG SE

Planning area and status of the procedure

The Ramin wind field is located in the southern part of the district of Vorpommern-Greifswald in an area previously used intensively for agriculture, surrounded by the Linkener Heide. The project area is located in the district of Bismark, north of Grambow, south-east of Gellin and Bismark, north-east of Ramin, east of Schmagerow and the Ramin solar power plant, and north-west of Neu Grambow.

The Ramin wind suitability area is suitable for the erection of wind turbines in accordance with the standard state criteria of Mecklenburg-Vorpommern and is therefore designated as a suitability area in the draft for the partial update of the Vorpommern regional plan with the area number 46/2015. The area is also very suitable for the planned project for several other reasons. These include

Good wind conditions for efficient wind energy use

Good accessibility thanks to the direct connection to the B111 and B104 highways and the proximity to the A20 and A11 freeways

Increased distances to settlements in accordance with applicable legal requirements

Suitable location in terms of noise and shadow impact emissions

Blends in with nature and the landscape thanks to its woodland surroundings, which also guarantee partial visual protection

In addition to the Ramin solar power plant, take on a pioneering role in the region and master a piece of the energy transition

Area no. 46/2015 has a total size of around 42 hectares, although only a few hectares are actually to be used for development. The construction and operation of 6 wind turbines are currently planned as part of the project applied for. All wind turbines are being planned by ENERTRAG and will also be built and operated by the company at a later stage.

In March 2019, an application for approval was submitted for the project for 6 WTGs in accordance with Section 4 of the Federal Immission Control Act (BImSchG). As part of the approval process, all documents will be put on public display to give residents, associations and authorities the opportunity to find out about the plans and make comments.

Planned wind turbines

The construction and operation of 6 wind turbines of the GE 5.5-158 turbine generation are currently planned for the Ramin wind project.

The GE 5.5-158 wind turbines have a rotor radius of around 79 m and an installed rated output of 5.5 megawatts. The hub height of the turbine is approx. 161 m and the total height is therefore approx. 240 m.

The GE 5.5-158 is a high-yield turbine for locations with medium wind conditions away from the direct coastline. Compared to previous models, the turbine has an enlarged swept rotor area of approx. 19,000 square meters, which allows the turbine to adapt optimally to both the individual site specifications and the local wind conditions. The larger rotor can capture more wind, generating more energy and thus reducing electricity generation costs. The GE 5.5-158 also ensures that the highest possible energy yield is generated hand in hand with applicable noise protection requirements. The switch-on speed is 3 m/s and the switch-off speed is 25 m/s.

The Cypress platform, which includes the 5.5-158, is driven by a revolutionary two-part blade design. This allows the blades to be assembled on site, reducing both equipment and roadwork costs, as well as the impact of overlength transportation during construction.

Enertrag DT_Drohne - JEWRO LR-49.jpg
Enertrag DT_Drohne - JEWRO LR-49.jpg

We are ENERTRAG

ENERTRAG produces renewable energy in a sustainable way, to keep the Earth habitable. Together. With passion. Energy ahead.

Citizen and municipal participation

Forms of participation

Participation takes many forms. ENERTRAG has always stood for broad and multi-layered participation by citizens and local authorities. In addition to informal participation within the planning process, it is of course also about economic participation. To this end, ENERTRAG has been supporting a large number of community energy companies for years. However, regional companies such as municipal utilities are also involved in the operation of the projects.

In Mecklenburg-Western Pomerania, the legislator has gone one step further and regulated the economic participation of citizens and municipalities by law.

Citizen and municipal participation law

The Citizen and Municipal Participation Act came into force on May 28, 2016. The basic idea of the law is to oblige project sponsors. They are to establish a limited liability company for new wind farms and then offer shares of at least 20 percent in this company to their immediate neighbors for participation. Each share may cost a maximum of 500 euros.

There are several ways to participate. Resident and neighboring communities can acquire shares in the project company that operates the future wind field. Alternatively, the project sponsor can offer an annual compensatory levy for the municipalities or other individually tailored forms of participation can be found for the municipalities. The decision on possible alternatives to direct participation in the project company is made by the municipality.

In addition, the project sponsors are free to offer citizens a savings product instead of shares. This reduces the risk for private investors. With the direct acquisition of shares in the project company, they would bear not only the profits but also the losses of a project within the scope of the respective investment. One way to participate in the earnings of the wind field with less risk is a savings product. In this case, the project company could transfer profits of 10 percent to a bank. Neighbors within a five-kilometer radius can set up savings bonds or fixed-term deposits with this bank, for example. The interest on the invested money is paid with the profit from the wind field.

The worldwide success of ENERTRAG projects

ENERTRAG uses its 30 years of experience worldwide to accelerate the transition to renewable energies.

 

Lübs-Ferdinandshof wind project

Nominal Power 4.5 MW
Operating Since 2016
Location Lübs
Status in operation

Lübs-Ferdinandshof wind project

ENERTRAG has been planning a new, regionally significant energy project for several years, for which a separate approval procedure with public participation is to be carried out. Transparent...

Windkraft Uckermark 2024 LR-191.jpg

Penkun wind project

Nominal Power 4.2 MW
Operating Since 2018
Location Penkun
Status in operation

Penkun wind project

ENERTRAG has been planning a wind field south of Penkun for several years, for which a separate approval procedure with public participation is to be carried out. In this context, transparen...

Enertrag_Windpark_23 JR_HR-9.jpg

Lüssow-Schmatzin wind project

Nominal Power 4.8 - 5.3 MW
Operating Since 2019
Location Lüssow
Status planned

Lüssow-Schmatzin wind project

ENERTRAG, wpd and naturwind are planning a new, regionally significant energy project for which a separate approval procedure with public participation will be carried out. The following pag...

IMG_0684.jpg

Schönfeld project complex

Nominal Power 10.5 MW
Operating Since 2020
Location Schönfeld
Status in operation

Schönfeld project complex

Bürgerwind Schönfeld UG & Co. KG initially plans to operate two Vestas V117 wind turbines, each with a rated output of 3.45 MW and a total capacity of 6.9 MW, known as the Schönfeld III proj...

Koppelsee_bald_IBN.jpg

Mattheshöhe project complex

Nominal Power 54.67 MW
Operating Since 2019
Location Matteshöhe
Status in operation

Mattheshöhe project complex

Bürgerwind Matteshöhe UG & Co. KG operates 4 GE 3.6-137 wind turbines with 3.63 MW and a total installed capacity of 14.52 MW in the municipalities of Uckerfelde and Grünow (Brandenburg).

Enertrag DT_Drohne - JEWRO LR-102.jpg

Ramin wind project

Nominal Power 33 MW
Operating Since 2027
Location Ramin
Status planned

Ramin wind project

ENERTRAG has been planning a wind field north-east of Ramin for several years, for which a separate approval procedure with public participation is to be carried out. The following pages are...

geplante_Windenergieanlage.jpeg

Rosow community energy project

Nominal Power 20.7 MW
Operating Since 2020
Location Rosow
Status in operation

Rosow community energy project

ENERTRAG Windfeld Schönfeld III GmbH & Co. KG plans to operate 5 Vestas V117 wind turbines, each with a rated output of 3.45 MW and a total capacity of 17.25 MW, known as the Rosow wind fiel...

News_Service.jpg

Dauer project complex

Nominal Power 27.43 MW
Operating Since 2015
Location Duration
Status in operation

Dauer project complex

The “Dauer III” and “Dauer IV” wind project is located in the north-east of Brandenburg, east of the Prenzlau district of Dauer. The environmentally friendly construction and operation of th...

Windkraft Uckermark 2024 LR-18.jpg

Kassow wind project

Nominal Power 5.7 MW
Operating Since
Location Kassow
Status under construction

Kassow wind project

ENERTRAG has been planning a new, regionally significant energy project for several years, for which a separate approval procedure with public participation is being carried out. In this con...

Enertrag_Windpark_23 JR_HR-219.jpg

Bonnhagen I wind project

Nominal Power 24 MW
Operating Since 2025
Location Bonnhagen
Status under construction

Bonnhagen I wind project

ENERTRAG SE is planning a new, regionally significant energy project for which a separate approval procedure will be carried out. The following pages provide transparent information in this ...

Lageplan_Ramelsloh_2022.jpeg

Ramelsloh wind project

Nominal Power 4.2 MW
Operating Since 2023
Location Ramelsloh
Status in operation

Ramelsloh wind project

ENERTRAG SE is planning the construction and operation of a 4 MW class wind turbine in Ramelsloh in the municipality of Seevetal. The planned and approved turbine is a VESTAS V150 with an ou...

geplante_Windenergieanlage.jpeg

Iserlohn wind project

Nominal Power 12 MW
Operating Since 2025
Location Iserlohn
Status under construction

Iserlohn wind project

ENERTRAG is planning to erect two wind turbines in the outskirts of Iserlohn, between Gerlingsen and Kalthof. Due to the 1,000 m distance regulation to residential areas stipulated in the st...

Wald_Westerwald.jpg

Westerwald II wind project

Nominal Power 34.2 MW
Operating Since 2028
Location Hauser Forest
Status planned

Westerwald II wind project

ENERTRAG SE is planning to erect a total of six wind turbines in the Hauser Wald forest in Hesse on the border with Rhineland-Palatinate, located between the municipalities of Dornburg, Wald...

nordkirchen.jpg

Nordkirchen wind project

Nominal Power 14.1 MW
Operating Since 2027
Location Nordkirchen
Status planned

Nordkirchen wind project

ENERTRAG is planning to erect three wind turbines on the outskirts of the municipality of Nordkirchen, on Münsterstrasse at Meinhövels Holz/Piekenbrock and to the west of the district of Cap...

geplante_Windenergieanlage.jpeg

Anklam combined cycle power plant

Nominal Power 240 MW electrolysis
Operating Since 2024
Location Anklam
Status planned

Anklam combined cycle power plant

Anklam combined cycle power plant

Chemin de Tuleras.1.jpg

CHEMIN DE TULERAS

Nominal Power 12 MW
Operating Since 2006
Location Villemeux, Boulay-Thierry
Status in operation

CHEMIN DE TULERAS

CHEMIN DE TULERAS

France4.jpg

SAINT-ANDRÉ-FARIVILLERS

Nominal Power 11.5 MW
Operating Since 2008
Location Saint-André-Farivillers
Status in operation

SAINT-ANDRÉ-FARIVILLERS

SAINT-ANDRÉ-FARIVILLERS

Campremy-20.jpg

CAMPREMY-BONVILLERS

Nominal Power 11.5 MW
Operating Since 2011
Location Campremy, Bonvillers
Status in operation

CAMPREMY-BONVILLERS

CAMPREMY-BONVILLERS

France.jpg

CHEMIN-BLANC

Nominal Power 12 MW
Operating Since 2012
Location Francastel
Status in operation

CHEMIN-BLANC

CHEMIN-BLANC

Campremy-20.jpg

DEMI-LIEUE

Nominal Power 12 MW
Operating Since 2011
Location Crèvecoeur le Grand, Viefvilliers
Status in operation

DEMI-LIEUE

DEMI-LIEUE

ENERTRAG_-Construction-Levage-sizing.jpg

ROINVILLE

Nominal Power 8 MW
Operating Since 2006
Location Roinville
Status in operation

ROINVILLE

ROINVILLE

France4.jpg

ORESMAUX

Nominal Power 12 MW
Operating Since 2008
Location Oresmaux
Status in operation

ORESMAUX

ORESMAUX

France3.jpg

FRESNOY-AU-VAL

Nominal Power 10 MW
Operating Since 2013
Location Fresnoy, Bougainville
Status in operation

FRESNOY-AU-VAL

FRESNOY-AU-VAL

France4.jpg

BOUGAINVILLE

Nominal Power 12 MW
Operating Since 2005
Location Bougainville
Status in operation

BOUGAINVILLE

BOUGAINVILLE

Campremy-20.jpg

CAIX

Nominal Power 12 MW
Operating Since 2013
Location Caix
Status in operation

CAIX

CAIX

France4.jpg

LIANCOURT

Nominal Power 7 MW
Operating Since 2017
Location Liancourt- Fosse
Status in operation

LIANCOURT

LIANCOURT

France.jpg

REMIGNY-LY-FONTAINE

Nominal Power 18.4 MW
Operating Since 2015
Location Rémigny, Ly-Fontaine
Status in operation

REMIGNY-LY-FONTAINE

REMIGNY-LY-FONTAINE

Campremy-20.jpg

LA BRIE CHAMPENOISE

Nominal Power 20 MW
Operating Since 2015
Location Corfélix, La Villeneuve les Charleville, Charleville
Status in operation

LA BRIE CHAMPENOISE

LA BRIE CHAMPENOISE

ENERTRAG_-Construction-Levage-sizing.jpg

ANGUILCOURT

Nominal Power 12 MW
Operating Since 2016
Location Anguilcourt, Brissay-Choigny
Status in operation

ANGUILCOURT

The Anguilcourt wind farm, commissioned in 2016 and located in the Hauts-de-France region, comprises 6 Senvion wind turbines with a total output of 12 MW.

France.jpg

SISSY-MÉZIERES

Nominal Power 10 MW
Operating Since 2017
Location Sissy, Châtillon-sur-Oise, Mézières
Status in operation

SISSY-MÉZIERES

SISSY-MÉZIERES

France4.jpg

SOUTH TERNOIS

Nominal Power 13.8 MW
Operating Since 2011
Location Croisette, Héricourt, Hauteclocque
Status in operation

SOUTH TERNOIS

SOUTH TERNOIS

France3.jpg

EAST TERNOIS

Nominal Power 11.5 MW
Operating Since 2011
Location Ligny Saint Flochel
Status in operation

EAST TERNOIS

TERNOIS EST

ENERTRAG_-Construction-Levage-sizing.jpg

CROISETTE I

Nominal Power 12 MW
Operating Since 2015
Location Croisette
Status in operation

CROISETTE I

CROISETTE I

France3.jpg

CROISETTE II

Nominal Power 5 MW
Operating Since 2015
Location Beauvois, Croix-en-Ternois, Siracourt
Status in operation

CROISETTE II

CROISETTE II

France.jpg

LA VILLE-AUX-BOIS-LÈS-DIZY

Nominal Power 8 MW
Operating Since 2016
Location La Ville-aux-Bois-Lès-Dizy
Status in operation

LA VILLE-AUX-BOIS-LÈS-DIZY

LA VILLE-AUX-BOIS-LÈS-DIZY

France4.jpg

TERNOIS NORTH

Nominal Power 9.2 MW
Operating Since 2012
Location Brias, Monchy Breton
Status in operation

TERNOIS NORTH

TERNOIS NORTH

Contact

Fields
Cloudflare Turnstile Captcha

I consent to the processing of my personal data in accordance with the privacy policy. I have read and understood the privacy policy