At the Schwarze Pumpe Industrial Park site, the innovative power plant concept, which utilises exclusively renewable energies such as wind power and photovoltaic systems, will demonstrate the possibilities of sector coupling. The production of green hydrogen, which enables the utilisation of renewably generated energy in the transport, industry and heating sectors, is an important step towards reducing dependence on fossil fuels.

In addition, the project of the partners Energiequelle, ENERTRAG and Zweckverband Industriepark Schwarze Pumpe will open up new value creation potential for the region and will serve as a reference for the conversion of conventional power plant sites to renewable energy generation.

Project profile
Location: 
Spreetal (Schwarze Pumpe)
Power class: 
12 MW (min. 30 MW possible)
Commissioning: 
Q1/2026
H2 volumes: 
1,000 t/a (2,500+ t/a) 
Delivery concept: 
Trailer and gas grid blending from 2026, local refueling, perspective Lausitz pipeline (H2)
"Since its foundation, ENERTRAG has seen hydrogen as an essential building block for a successful energy transition. With the RefLau, we will show that the generation of renewable electricity can be stabilised and that Lusatia can become a model region for successful structural change."

Dr. Gunar Hering

CEO ENERTRAG SE

Enertrag DT_Drohne - JEWRO LR-58.jpg
Enertrag DT_Drohne - JEWRO LR-58.jpg
Enertrag DT_Drohne - JEWRO LR-58.jpg
Enertrag DT_Drohne - JEWRO LR-58.jpg

About ENERTRAG

As an independent energy company, ENERTRAG generates electricity and heat exclusively from renewable sources and supplies secure, affordable renewable energy for all areas of life. With over 30 years of experience, ENERTRAG combines all the expertise required for successful operation and efficient maintenance, for citizen-centered planning, reliable construction of energy plants and grids through to complete integrated power plants. 

Learn more

Flagship projects

The goal: 100 percent fossil-free – worldwide. To achieve this, ENERTRAG is turning pioneering ideas into sustainable, viable solutions.

ETAPA 4 ZONA 1-2_Moment2.jpg

Hyphen: Project for green hydrogen in Namibia

Nominal Power 3.5 GW
Operating Since
Location Namibia
Status TBA
ENERTRAG_Spatenstich_Elektrolyseur_Osterweddingen_20240513v4.jpg

Osterweddingen hydrogen plant

Nominal Power 10 MW
Operating Since 2025
Location Osterweddingen
Status under construction
PV Uckermark_ Enertrag LR-36.jpg

PV field Kreuz Uckermark

Nominal Power 20 MW
Operating Since 2023
Location Gramzow
Status in operation
Bild3.png

Battery storage Tantow

Nominal Power 60 MW / 120 MWh
Operating Since 2026
Location Tantow
Status planned
Enertrag_Windpark_23 JR_HR-217.jpg

Wind farm Dunowo, Poland

Nominal Power 186 MW
Operating Since
Location Poland
Status in operation
TZZS5378.jpg

Electrolysis corridor in Eastern Germany

Nominal Power 185 MW Elektrolyse
Operating Since
Location Germany
Status planned
Visualisierung_Pasewalk_resized_sharpened.png

Verbundkraftwerk Pasewalk

Nominal Power 60 MW
Operating Since 2029
Location Pasewalk
Status planned
Header_Projektwebsite_VKW_Anklam.jpg

Verbundkraftwerk Anklam

Nominal Power 240 MW
Operating Since 2029
Location Anklam
Status planned

Reference power plant Lausitz

Nominal Power 12 MW
Operating Since
Location Lusatia
Status planned

Concrete Chemicals

Nominal Power 35 kt/a SAF
Operating Since 2028
Location Rüdersdorf
Status planned

Heidekrautbahn

Nominal Power 4 MW
Operating Since
Location Oberhavel (Oranienburg)
Status under construction
Tambores_15_-_Foto_600.png

Tambor: E-methanol from green hydrogen

Nominal Power 350 MW
Operating Since
Location Uruguay
Status planned

News

Stay up to date with the latest articles from the press area

Contact

Fields
Cloudflare Turnstile Captcha

Further information on the processing of your personal data can be found in our privacy notice.