Solar Farm and Battery Storage Facility at Lake Brüssow:

Clean energy for the Uckermark

EU funding notice 

Funded by the European Union and the State of Brandenburg (ERDF/JTF) 

V Kofinanziert von der Europäischen Union_POS.png

Regional benefits 

Solar power from Brüssower See strengthens the regional energy supply. The project generates local economic value during the construction phase and whilst in operation. The integrated battery storage system can store solar power and release it at a later time.

Rammen 5.jpeg

What it’s all about:

A solar farm with integrated battery storage is being built on around 40 hectares of farmland north of Brüssower See. The project combines 44.5 MWp of solar capacity with a storage capacity of 10 MWh and supplies reliable green electricity to Brandenburg.

The project at a glance:

Technology:
Ground-mounted photovoltaic system with battery storage
Total rated output:
44.5 MWp 
Number of modules:
approx. 71,500 monocrystalline, bifacial PV modules 
Location:
North of Lake Brüssow, east of the L251, Brandenburg
CO₂ savings:
16,684 tonnes per year
Inverters:
123
Battery storage:
5 MW / 10 MWh
Households supplied:
15,000 
Planning status:
Under construction, completion June 2027 
2050ac3f-3107-4754-9073-5da03cde987e.jpg

We’re here to help.  

Do you have any questions or concerns? Please feel free to get in touch. We’ll be available to assist you throughout the entire project.

Your contact for the project:

  • Victor Bubel, Team Leader, PV Development & Planning

Selected projects

ENERTRAG realizes projects that set the international course for a fossil-free energy supply and transforms visionary ideas into viable, economical solutions with flagship projects. 

ENERTRAG_Spatenstich_Elektrolyseur_Osterweddingen_20240513v4.jpg

Osterweddingen hydrogen plant

Nominal Power 10 MW
Operating Since 2026
Location Osterweddingen
Status under construction
PV Uckermark_ Enertrag LR-36.jpg

PV field Kreuz Uckermark

Nominal Power 20 MW
Operating Since 2023
Location Gramzow
Status in operation
Enertrag DT_Drohne - JEWRO LR-56.jpg

Wind farm Sonnenberg Repowering

Nominal Power 197,2 MW
Operating Since 2029
Location Oschersleben
Status planned
ETAPA 4 ZONA 1-2_Moment2.jpg

Hyphen: Project for green hydrogen in Namibia

Nominal Power 3.5 GW
Operating Since
Location Namibia
Status TBA
Enertrag_Windpark_23 JR_HR-217.jpg

Wind farm Dunowo, Poland

Nominal Power 186 MW
Operating Since
Location Poland
Status in operation
Visualisierung_Pasewalk_resized_sharpened.png

Verbundkraftwerk Pasewalk

Nominal Power 60 MW
Operating Since 2029
Location Pasewalk
Status planned

Electrolysis Plant Prenzlau Nord

Nominal Power 130 MW
Operating Since 2029
Location Prenzlau North
Status planned
Header_Concrete_Chemicals_2026.jpg

Brandenburg eSAF

Nominal Power 30,000 t/a eSAF
Operating Since 2030
Location Schwedt, Brandenburg
Status planned

Heidekrautbahn

Nominal Power 4 MW
Operating Since 2026
Location Oberhavel (Oranienburg)
Status in operation
ENERTRAG_Bertikow_3DComp_vorabversion.png

Bertikow battery storage system

Nominal Power 200 MW
Operating Since 2027
Location Bertikow
Status planned
ElleryStudio-Enertrag-GFL-Perspective-e05-Asphalt-crop.jpg

Green Fuels Lausitz

Nominal Power 280 MW
Operating Since 2031
Location Lausitz
Status planned
Wiesenau hero.jpg

Windpark Wiesenau

Nominal Power 50,4 MW
Operating Since
Location Oschersleben
Status planned

Contact

Fields
Cloudflare Turnstile Captcha

Further information on the processing of your personal data can be found in our privacy notice.

Selected projects

ENERTRAG realizes projects that set the international course for a fossil-free energy supply and transforms visionary ideas into viable, economical solutions with flagship projects. 

ENERTRAG_Spatenstich_Elektrolyseur_Osterweddingen_20240513v4.jpg

Osterweddingen hydrogen plant

Nominal Power 10 MW
Operating Since 2026
Location Osterweddingen
Status under construction
PV Uckermark_ Enertrag LR-36.jpg

PV field Kreuz Uckermark

Nominal Power 20 MW
Operating Since 2023
Location Gramzow
Status in operation
Enertrag DT_Drohne - JEWRO LR-56.jpg

Wind farm Sonnenberg Repowering

Nominal Power 197,2 MW
Operating Since 2029
Location Oschersleben
Status planned
ETAPA 4 ZONA 1-2_Moment2.jpg

Hyphen: Project for green hydrogen in Namibia

Nominal Power 3.5 GW
Operating Since
Location Namibia
Status TBA
Enertrag_Windpark_23 JR_HR-217.jpg

Wind farm Dunowo, Poland

Nominal Power 186 MW
Operating Since
Location Poland
Status in operation
Visualisierung_Pasewalk_resized_sharpened.png

Verbundkraftwerk Pasewalk

Nominal Power 60 MW
Operating Since 2029
Location Pasewalk
Status planned

Electrolysis Plant Prenzlau Nord

Nominal Power 130 MW
Operating Since 2029
Location Prenzlau North
Status planned
Header_Concrete_Chemicals_2026.jpg

Brandenburg eSAF

Nominal Power 30,000 t/a eSAF
Operating Since 2030
Location Schwedt, Brandenburg
Status planned

Heidekrautbahn

Nominal Power 4 MW
Operating Since 2026
Location Oberhavel (Oranienburg)
Status in operation
ENERTRAG_Bertikow_3DComp_vorabversion.png

Bertikow battery storage system

Nominal Power 200 MW
Operating Since 2027
Location Bertikow
Status planned
ElleryStudio-Enertrag-GFL-Perspective-e05-Asphalt-crop.jpg

Green Fuels Lausitz

Nominal Power 280 MW
Operating Since 2031
Location Lausitz
Status planned
Wiesenau hero.jpg

Windpark Wiesenau

Nominal Power 50,4 MW
Operating Since
Location Oschersleben
Status planned