Osterweddingen hydrogen plant

Green hydrogen for the energy transition

In Osterweddingen near Magdeburg, the energy transition is entering the next phase: a hydrogen plant is currently being built in the local industrial park, which will enable local industrial companies to obtain green hydrogen in future.

In the first stage of expansion, around 900 tonnes of green hydrogen per year will be produced using a 10 MW PEM electrolyser. The electrolyser will be operated to support the system in order to compensate for fluctuations in the generation of electricity from wind and solar power and thus reduce the load on the electricity grid.

The green hydrogen will be used to decarbonise industry, as a fuel for long-haul transport, to feed into hydrogen pipelines and, in the long term, to generate electricity during a ‘dark lull’.

Project profile
Location: 
Osterweddingen (near Magdeburg)
Power class: 
10 MW
Commissioning: 
2025
H2 volumes: 
900 t/a
Delivery concept: 
Trailer fleet (bis 380 bar)
ELLERYSTUDIO-2307-Enertrag-Infografik-Osterweddingen-01.jpg
"Hydrogen is an indispensable building block for the energy transition and offers solutions for decarbonising various sectors, from heavy industry to long-haul transport. By linking directly to our nearby wind and solar farms, this electrolyser will not only produce green hydrogen, but also promote further industrialisation in the region and increase local value creation."

Dr. Tobias Bischof-Niemz

ENERTRAG Board Member Projects International & Technology

Enertrag DT_Drohne - JEWRO LR-58.jpg
Enertrag DT_Drohne - JEWRO LR-58.jpg
Enertrag DT_Drohne - JEWRO LR-58.jpg
Enertrag DT_Drohne - JEWRO LR-58.jpg

About ENERTRAG

As an independent energy company, ENERTRAG generates electricity and heat exclusively from renewable sources and supplies secure, affordable renewable energy for all areas of life. With over 30 years of experience, ENERTRAG combines all the expertise required for successful operation and efficient maintenance, for citizen-centered planning, reliable construction of energy plants and grids through to complete integrated power plants. 

Learn more

Flagship projects

The goal: 100 percent fossil-free – worldwide. To achieve this, ENERTRAG is turning pioneering ideas into sustainable, viable solutions.

ETAPA 4 ZONA 1-2_Moment2.jpg

Hyphen: Project for green hydrogen in Namibia

Nominal Power 3.5 GW
Operating Since
Location Namibia
Status TBA
ENERTRAG_Spatenstich_Elektrolyseur_Osterweddingen_20240513v4.jpg

Osterweddingen hydrogen plant

Nominal Power 10 MW
Operating Since 2025
Location Osterweddingen
Status under construction
PV Uckermark_ Enertrag LR-36.jpg

PV field Kreuz Uckermark

Nominal Power 20 MW
Operating Since 2023
Location Gramzow
Status in operation
Bild3.png

Battery storage Tantow

Nominal Power 60 MW / 120 MWh
Operating Since 2026
Location Tantow
Status planned
Enertrag_Windpark_23 JR_HR-217.jpg

Wind farm Dunowo, Poland

Nominal Power 186 MW
Operating Since
Location Poland
Status in operation
TZZS5378.jpg

Electrolysis corridor in Eastern Germany

Nominal Power 185 MW Elektrolyse
Operating Since
Location Germany
Status planned
Visualisierung_Pasewalk_resized_sharpened.png

Verbundkraftwerk Pasewalk

Nominal Power 60 MW
Operating Since 2029
Location Pasewalk
Status planned
Header_Projektwebsite_VKW_Anklam.jpg

Verbundkraftwerk Anklam

Nominal Power 240 MW
Operating Since 2029
Location Anklam
Status planned

Reference power plant Lausitz

Nominal Power 12 MW
Operating Since
Location Lusatia
Status planned

Concrete Chemicals

Nominal Power 35 kt/a SAF
Operating Since 2028
Location Rüdersdorf
Status planned

Heidekrautbahn

Nominal Power 4 MW
Operating Since
Location Oberhavel (Oranienburg)
Status under construction
Tambores_15_-_Foto_600.png

Tambor: E-methanol from green hydrogen

Nominal Power 350 MW
Operating Since
Location Uruguay
Status planned

News

Stay up to date with the latest articles from the press area

Contact

Fields
Cloudflare Turnstile Captcha

Further information on the processing of your personal data can be found in our privacy notice.