Electrolysis corridor in Eastern Germany

IPCEI joint project creates a strong hub for green hydrogen. 

Integrated and networked projects are the only way to achieve an efficient hydrogen economy in Germany and Europe. This is accurately what the ENERTRAG project ‘Electrolysis Corridor East Germany’ stands for. This is part of the joint project ‘doing hydrogen’, which links together innovative individual projects in Eastern Germany – and is an important building block for the implementation of the German and European hydrogen strategy. 

The transformation from natural gas to green hydrogen requires the establishment of a hydrogen-based value chain. To produce sufficient green hydrogen, electrolyzers need to be built on a large scale – as well as renewable energy plants to supply the necessary green electricity. ENERTRAG does both.  

In the electrolysis corridor in Eastern Germany, the capacities are spread across two locations in Mecklenburg-Western Pomerania and Brandenburg. The total installed capacity of the electrolyzers is 185 megawatt. 

H2
The entire value chain for green hydrogen 

The centerpiece of the ‘Electrolysis Corridor Eastern Germany’ is the use of the existing gas grid infrastructure for hydrogen production. The electrolysis sites along a north-south axis in Rostock-Laage (Mecklenburg-Western Pomerania) and Falkenhagen/Prignitz (Brandenburg) are supplied with climate-neutral electricity from ENERTRAG's own wind energy and photovoltaic systems. 

Both electrolyzers form a transnational corridor along the ‘doing hydrogen’ hydrogen pipeline and will feed around 17,000 tonnes of locally produced hydrogen into the pipeline each year. The green hydrogen can be supplied to the Concrete Chemicals subproject at the Rüdersdorf site, as well as to other industrial customers - thus contributing to de-fossilization. 

Thanks to the geographical distribution of the sites, ENERTRAG is making a valuable contribution to regional development and enabling the efficient utilization of renewable resources. H2 production refines surplus electricity that would otherwise remain unused, thereby increasing local value creation. 

It is estimated that the electrolysis corridor in Eastern Germany will avoid greenhouse gas emissions of around 135,000 tonnes of carbon dioxide equivalents per year in the first 20 years of operation.

Project profiles
Locations:  
Falkenhagen/Prignitz (Brandenburg) 
Rostock-Laage (Mecklenburg-Western Pomerania) 
Renewable energy capacity: 
185 MW electrolysis 
Hydrogen production: 
17,000 t of hydrogen per year 
Investment costs: 
94 m. €   
Funding program: 
Funding program Important Project of Common European Interest (IPCEI) 
Planned commissioning:
2027 
Expected CO2 savings per year: 
135.000 t
"For ENERTRAG, the “Electrolysis Corridor East Germany” is one of the most important milestones in the development of the national hydrogen infrastructure. With our electrolyser capacities in Brandenburg and Mecklenburg-Western Pomerania, we have a market share of around 12 per cent in Germany and are helping to supply urgently needed green hydrogen to industrial customers."

Dr. Tobias Bischof-Niemz

ENERTRAG Board Member Projects International & Technology

Technologies of the project

Wind power & photovoltaics

Wind turbines utilize the power of the wind to drive rotor blades and, via these, a generator. In this way, electrical energy is generated. Incident sunlight is used to generate electrical energy in solar cells.

Electrolysis

Electrolyzers split water into hydrogen and oxygen with the help of electricity from local wind and solar power plants.

Authorization by the EU Commission 

The joint project ‘doing Hydrogen’ is an association of renewable energy operators, hydrogen producers, hydrogen consumers and gas network operators as part of the IPCEI funding program. In February 2024, the European Commission approved a third wave of IPCEI projects for the development of hydrogen infrastructure in Europe under EU state aid rules. The ‘IPCEI Hy2Infra’ wave of projects was prepared and submitted by seven Member States: France, Germany, Italy, the Netherlands, Poland, Portugal and Slovakia.  

The projects in this wave aim to promote domestic hydrogen production. The aim is to reduce dependence on natural gas and contribute to achieving the goals of the European Green Deal and the REPowerEU plan.  

The ‘Electrolysis Corridor Eastern Germany’ plays an important role within the project wave. The aim is to establish a stable and economic integration of a hydrogen-based value chain - in the federal states of Mecklenburg-Western Pomerania, Brandenburg, Berlin, Saxony and Saxony-Anhalt. The approval of the Hy2Infra wave is a decisive step in this process. 
 

WEA-Service_67.jpg
Enertrag DT_Drohne - JEWRO LR-58.jpg
Enertrag DT_Drohne - JEWRO LR-58.jpg

About ENERTRAG

As an independent energy company, ENERTRAG generates electricity and heat exclusively from renewable sources and supplies secure, affordable renewable energy for all areas of life. With over 30 years of experience, ENERTRAG combines all the expertise required for successful operation and efficient maintenance, for citizen-centered planning, reliable construction of energy plants and grids through to complete integrated power plants.  

News

Stay up to date with the latest articles from the press area

ENCAVIS acquires wind farms from ENERTRAG in Bonnhagen and Roitzsch

ENERTRAG relies on strong leadership: new input in engineering and implementation

Repowering Roitzsch

ENERTRAG and Ingka Investments to explore repowering in Germany

Meeting von N-ENERGIE und Powersystem (PY) von ENERTRAG auf der Hamburg WindEnergy 2024

N-ERGIE relies on ENERTRAG: Partnership for the use of the power system for technical operations management and 24/7 monitoring

Procurement reforms critical to accelerating SA's renewable energy rollout

ENERTRAG und Stadt Prenzlau schließen Verträge zur finanziellen Beteiligung an Windenergieanlagen.JPG

ENERTRAG and the town of Prenzlau conclude contracts for financial participation in wind turbines

Enos-Banda-1-1024x684.jpg

ENERTRAG Announces Appointment of Enos Banda as CEO of its South African business

Clinton Carter-Brown.jpg

Connecting to a constrained grid

HH_Bueroeroeffnung_Gruppenbild_Laeisz_Dressel_Hering_240923-ENERTRAG_1371.jpg

ENERTRAG opens office in Hamburg: New momentum for green hydrogen economy

ENERTRAG Expands Its Management Board with a New Position

HiShiFT.jpg

Empowering women in energy: A step towards transforming leadership in South Africa

ENERTRAG South Africa's commitment to societal development and sustainable energy transition

Wasserstofftank

ENERTRAG joins aireg as a member

15.7.2024-Förderbescheidübergabe IPCEI Wasserstoff-019.JPG

Handover of the funding notification for the ENERTRAG project "Electrolysis Corridor East Germany"

Enertrag DT_Drohne - JEWRO LR-98_web.jpg

ENERTRAG celebrates record year 2023/24 in project development

Tom Lange, Reimar von Wachholtz (beide ENERTRAG), Tobias Goldschmidt (Energiewendeminister Schleswig-Holstein), Jörn Genoux (Leiter Referat für Wirtschaft der Stadt Kiel)

ENERTRAG eröffnet neues Büro in Kiel

ENERTRAG commissions first wind turbine in Lower Saxony

ENERTRAG secures medium-term investment loan to finance growth

Ground-breaking ceremony for electrolyser at Osterweddingen Industrial Park

Verbundkraftwerk Anklam: A milestone for sustainable energy and regional growth

Hyphen hydrogen project in Namibia on the way to becoming a strategic foreign project of the Federal Republic of Germany

3D_Visualisierung_Elektrolyseur.jpg

EU Commission approves funding for the ENERTRAG project "Electrolysis Corridor East Germany"

hyphen.png

Fraunhofer IWES is setting new standards in onshore numerical site assessment in Namibia

ENERTRAG_TBN_2024.jpg

ENERTRAG appoints Dr. Tobias Bischof-Niemz as Member of the Management Board for Projects International & Technology

ENERTRAG_SE_Bildmaterial_Solarpark_Kreuz_Uckermark.jpeg

Full (solar) power ahead: ENERTRAG Operation takes over operations management of 20 MW large-scale photovoltaic project

ENERTRAG_Hybridkraftwerk_Prenzlau_Wasserstoff.jpg

ENERTRAG selects Elogen for the delivery of a 10 MW PEM electrolyser

Drohneninspektion_7_Jewgeni Roppel.jpg

Right in time for operators: ENERTRAG Operation offers drone inspection in France by 2023

PRESSEMITTEILUNG_ENERTRAG_Betrieb_bietet_Drohneninspektion_in_Frankreich_an_Website1.jpg

ENERTRAG Operation offers drone inspection as a licence model by 2023

2022-09-19-Dunowo.jpg

ENERTRAG inaugurates 186 MW Dunowo wind project in Poland

Dr._Gunar_Hering.png

Dr. Gunar Hering to become new ENERTRAG CEO

Logo_Powersystem.jpg

Consistently high standards: ENERTRAG Powersystem is again certified according to ISO/IEC 27001 and DIN EN ISO 9001

2022-05-10-ENERTARG-SEG.jpg

ENERTRAG plans green hydrogen project in the Tacuarembó region of Uruguay

Concrete_Chemicals__c__ENERTRAG.jpeg

Concrete Chemicals on the way to climate-friendly cement production and CO2-neutral flying by using green hydrogen

20220307_Leitwarte_Frankreich.jpg

ENERTRAG Operation further expands business in France

ENERTRAG et Orange Pologne concluent un contrat d’achat d’électricité (Power Purchase Agreement).

Vestas_126__Windfeld_Dargikowo.jpg

ENERTRAG and Orange Polska secure a long term PPA in Poland

ENERMAG-17-604x675.png

Parution du Numéro 17 l’ENER’MAG

20220107_ENERTRAG_SE.jpg

ENERTRAG becomes European: Conversion to SE completed

2021_11_09_Kolumbien.jpg

Colombian Energy Minister Diego Mesa visits ENERTRAG

Photo_Hybrid_power_plant_web_pm.jpg

Uruguayan delegation visits ENERTRAG and receives first-hand information about the potential of green hydrogen.

2021_11-02_ENERTRAG_TeXla_Energias_Renovables.jpg

ENERTRAG enters the Spanish market for renewable energies and establishes a joint venture with TeXla Energías Renovables

2021_07_15_Concrete_Chemicals.jpg

International consortium launches green hydrogen project to decrease the cement industry’s CO2 footprint

DJI_0654-1080x675.jpg

ENERTRAG poursuit son développement en région Bourgogne-Franche-Comté

2021_06_08_uebersicht_IPCEI_Standorte.png

ENERTRAG enters second IPCEI tender round with 210 MW electrolysis plant

Visualisierungen_Green_Areal_Lausitz2_Bild_Euromovement.jpg

Green Areal Lausitz (GRAL): Euromovement and ENERTRAG sign cooperation agreement to implement a CO2-neutral energy concept

2021-03-11_Press-Photo_ENERTRAG_Bloque_II_1_.jpg

ENERTRAG develops improved Bloc II main bearing solution for Ecotecnia wind turbine

Contact

Fields
Cloudflare Turnstile Captcha

I consent to the processing of my personal data in accordance with the privacy policy. I have read and understood the privacy policy