Skip to main content
Bild3.png

Battery storage Tantow

Balancing fluctuations, stabilising the grid

The Tantow battery storage facility is a pioneering project for the energy transition and makes a key contribution to stabilising the electricity grid. A high-performance storage solution with an output of 60 MW and a capacity of 120 MWh, consisting of 32 battery containers, 16 MV power blocks and 2 switchgear buildings, is being built on an area of around 1 hectare.

The storage facility balances out fluctuations in electricity generation from renewable energies, stores surplus energy and makes it available when needed. In this way, it improves grid stability and enables greater integration of renewable energies. Construction will begin in 2025 and commissioning is planned for early 2026. The Tantow battery storage facility will significantly boost the flexibility of the renewable energy supply.

Project profile
Location: 
Tantow (Uckermark)
Area: 
ca. 1 ha
Nominal Power: 
60 MW / 120 MWh
Commissioning: 
2026
Components: 
32 × 20’ battery containers, 16 MS power blocks,
2 switchgear buildings
"Battery storage systems compensate for fluctuations in the electricity grid and provide additional power when there is little primary energy available. ENERTRAG is committed to the development and implementation of solutions that combine economic efficiency and technological expertise."

Dr. Gunar Hering

CEO ENERTRAG SE

Enertrag DT_Drohne - JEWRO LR-58.jpg
Enertrag DT_Drohne - JEWRO LR-58.jpg
Enertrag DT_Drohne - JEWRO LR-58.jpg
Enertrag DT_Drohne - JEWRO LR-58.jpg

About ENERTRAG

As an independent energy company, ENERTRAG generates electricity and heat exclusively from renewable sources and supplies secure, affordable renewable energy for all areas of life. With over 30 years of experience, ENERTRAG combines all the expertise required for successful operation and efficient maintenance, for citizen-centered planning, reliable construction of energy plants and grids through to complete integrated power plants. 

Learn more

Flagship projects

The goal: 100 percent fossil-free – worldwide. To achieve this, ENERTRAG is turning pioneering ideas into sustainable, viable solutions.

ETAPA 4 ZONA 1-2_Moment2.jpg

Hyphen: Project for green hydrogen in Namibia

Nominal Power 3.5 GW
Operating Since
Location Namibia
Status TBA

Hyphen: Project for green hydrogen in Namibia

Green hydrogen and ammonia: In Namibia, ENERTRAG is making a contribution to achieving the global decarbonization targets.

ENERTRAG_Spatenstich_Elektrolyseur_Osterweddingen_20240513v4.jpg

Osterweddingen hydrogen plant

Nominal Power 10 MW
Operating Since 2025
Location Osterweddingen
Status under construction

Osterweddingen hydrogen plant

A hydrogen plant in Osterweddingen near Magdeburg will supply local industries with green hydrogen. A 10 MW PEM electrolyser will produce 900 tonnes annually, stabilizing the grid by balanc...

PV Uckermark_ Enertrag LR-36.jpg

PV field Kreuz Uckermark

Nominal Power 20 MW
Operating Since 2023
Location Gramzow
Status in operation

PV field Kreuz Uckermark

The Kreuz Uckermark solar field generates 20 million kWh annually and has a 3.4 MW battery for network stability and emergency supply.

Bild3.png

Battery storage Tantow

Nominal Power 60 MW / 120 MWh
Operating Since 2026
Location Tantow
Status planned

Battery storage Tantow

The Tantow battery storage facility (60 MW, 120 MWh) will stabilize the grid by storing surplus renewable energy and supplying it when needed. Built on 1 hectare with 32 battery containers, ...

Enertrag_Windpark_23 JR_HR-217.jpg

Wind farm Dunowo, Poland

Nominal Power 186 MW
Operating Since
Location Poland
Status in operation

Wind farm Dunowo, Poland

One of the largest wind projects in Poland: With the Dunowo project, ENERTRAG has put its largest project into operation to date.

TZZS5378.jpg

Electrolysis corridor in Eastern Germany

Nominal Power 185 MW Elektrolyse
Operating Since
Location Germany
Status planned

Electrolysis corridor in Eastern Germany

Integrated and networked projects are the only way to achieve an efficient hydrogen economy in Germany and Europe. This is accurately what the ENERTRAG project ‘Electrolysis Corridor East Ge...

Concrete Chemicals

Nominal Power 35 kt/a SAF
Operating Since 2028
Location Rüdersdorf
Status planned

Concrete Chemicals

The innovative lighthouse project Concrete Chemicals is considered a milestone in the decarbonisation of aviation.

Reference power plant Lausitz

Nominal Power 12 MW
Operating Since
Location Lusatia
Status planned

Reference power plant Lausitz

The innovative power plant concept will demonstrate the possibilities of sector coupling using exclusively renewable energies.

Heidekrautbahn

Nominal Power 4 MW
Operating Since
Location Oberhavel (Oranienburg)
Status under construction

Heidekrautbahn

We want to make CO₂-free mobility in rail transport a reality for the first time in the state of Brandenburg by 2024.

Tambores_15_-_Foto_600.png

Tambor: E-methanol from green hydrogen

Nominal Power 350 MW
Operating Since
Location Uruguay
Status planned

Tambor: E-methanol from green hydrogen

ENERTRAG is planning the Tambor Green Hydrogen Hub in the Department of Tacuarembó, Uruguay.

News

Stay up to date with the latest articles from the press area

Contact

Fields
Cloudflare Turnstile Captcha

I consent to the processing of my personal data in accordance with the privacy policy. I have read and understood the privacy policy