Plant erected

12/18/2020

Plant E3 is now fully constructed.

Rosow_gesamte_Anlage.jpg

After the E3 plant was fully erected last week, the transformer connection was completed this week. The system can therefore be put into operation shortly.

Project

ENERTRAG Windfeld Schönfeld III GmbH & Co KG plans to operate 5 Vestas V117 wind turbines, each with a rated output of 3.45 MW and a total capacity of 17.25 MW, known as the Rosow wind field, in the municipality of Mescherin (Brandenburg). The original plan was to erect 6 wind turbines in the Rosow project. However, the E2 site was postponed and is currently scheduled to go into operation at the end of 2021.

2024_ENERTRAG_Joerg_Mueller.jpg
"We are shaping the next phase of energy transition."

Jörg Müller

Chairman of the Supervisory Board of ENERTRAG SE

Location

The Rosow wind farm is located on agricultural land west of Neurosow in the district of Uckermark (Brandenburg) in the immediate vicinity of the border with the Republic of Poland and the Nadrensee wind farm with 13 wind turbines, which were erected and commissioned by ENERTRAG in 2005. The grid connection of the Rosow wind field is currently planned via the Penkun substation (owned and operated by ENERTRAG Netz GmbH) via the Randowhöhe substation via the Bertikow substation into the 50Hertz Transmission GmbH grid.

Standort_Rosow.jpg
2021_02_25_Dark_Sky.jpg
2021_02_25_Dark_Sky.jpg

We are ENERTRAG

ENERTRAG produces renewable energy in a sustainable way, to keep the Earth habitable. Together. With passion. Energy ahead.

Site plan

ENERTRAG Windfeld Schönfeld III GmbH & Co KG is planning 5 Vestas V117 wind turbines, called Windfeld Rosow. Construction work has already started in 10/2019. The planned wind turbine sites are located in the designated wind suitability area no. 24 "Rosow" approx. 35 km east of Prenzlau and one kilometer north of the village of Rosow on an open field. The German-Polish border and the Oder valley follow to the east.

Lageplan_Rosow.jpg

System technology

The planned five Vestas V117 wind turbines with a rated output of 3.45 MW and a total installed capacity of 17.25 MW have a hub height of 141.5 m and a rotor diameter of 117 m.

Vestas_V117.jpg

The worldwide success of ENERTRAG projects

ENERTRAG uses its 30 years of experience worldwide to accelerate the transition to renewable energies.

Contact

Fields
Cloudflare Turnstile Captcha

I consent to the processing of my personal data in accordance with the privacy policy. I have read and understood the privacy policy