Skip to main content
Enertrag_Windpark_23 JR_HR-211.jpg

Nordkirchen wind project

Nordkirchen wind project

ENERTRAG is planning to erect three wind turbines on the outskirts of the municipality of Nordkirchen, on Münsterstrasse at Meinhövels Holz/Piekenbrock and to the west of the district of Capelle at Gorbach (Altendorf).

ENERTRAG began developing the wind farm at the start of 2018. The project has progressed very well with the recruitment of local project partners, the informal involvement of local politicians and the completion of numerous studies and expert reports in preparation for the permit application. With the receipt of the first permit at the end of last year and the expected receipt of the other two permits this year, this website has now been launched to provide ongoing public information on the progress of the project.

The three planned wind turbines will produce more than 35,000 MWh of clean electricity per year. The municipality of Nordkirchen currently has around 10,600 inhabitants and 180 businesses. On balance, every household could be supplied with locally generated, sustainable energy and 2/3 of the electricity generated would be available for trade and industry. This would result in annual savings of around 30,000 tons of CO2 compared to electricity generated from fossil fuels.

ENERTRAG is thus acting for a clean and secure future for the benefit of the people in the country and future generations on the basis of 100% renewable energies.

nordkirchen.jpg

Approval for a further plant at Gorfelds Placken

05/17/2024

The permit for a further plant at Gorfelds Placken was published on 05/15/2024

news.jpg

 

The district administrator of the Coesfeld district has given the green light for the construction and operation of a new wind turbine called "ENERTRAG AB C1" in Nordkirchen Altendorf. The permit was issued on 02.05.2024 and also includes other official conditions relating to environmental protection and occupational health and safety.

The official gazette can be downloaded here: Official Gazette Coesfeld

"Together, we will overcome fossil fuels. ENERTRAG has the potential to completely replace conventional power plants."

Dr. Gunar Hering

CEO ENERTRAG SE

Locations and planning area

The planning area is located on private land in the town of Nordkirchen (Coesfeld district, NRW). It lies to the north-west of the town of Nordkirchen and to the west of the village of Capelle.

The sites are located entirely in the former potential areas that the municipality of Nordkirchen provided for in the last partial update of the land use plan (FNP). This FNP does not have any exclusionary effect, meaning that our project is permitted in the outdoor area in accordance with Section 35 of the German Civil Code (BGB). A wind turbine is included in the original backdrop of the regional plan of the Münster administrative district. The Münster regional plan is currently being adapted and revised in line with the changes to the regional development plan. In the participation process for the first draft last year, 1200 comments* with over 4000 individual suggestions were received. These are currently being evaluated (as of March 2024). The discussion and revision of the draft plan will take place in summer 2024. At the end of 2024, there will be a second participation procedure in which comments on the planned areas can be submitted again. As the areas planned here are fundamentally suitable, we are actively participating in the process of developing the Münster regional plan.

Source: Münster district government - Münsterland regional plan: 1,200 comments (bezreg-muenster.de)

Planning status - What has happened so far

At the beginning of 2018, a planning concept was initially drawn up and the optimal locations in the potential areas of the municipality of Nordkirchen were identified. The noise and shadow impact and the potential energy yield were then evaluated as part of further project development.

Since spring 2019, the company ecoda has been investigating the impact of the planning on flora and fauna in the study area on behalf of ENERTRAG. All necessary investigations were carried out by continuously mapping wind energy-sensitive species.

The application documents were completed between mid-2021 and the end of 2021. Among other things, further expert reports were commissioned and discussions were held with the relevant authorities regarding the scope of the application documents.

Parallel to the planning law process, the political groups represented in the municipal council were informed about the planning project in the early stages and discussions were offered.

Personal discussions were held with the municipal administration at various times over the past few years.

We presented ourselves and the project at a building committee meeting back in 2019. Finally, parts of the project were presented to the municipality and the building committee in summer 2023 and at the beginning of this year.

Approval procedure and timetable

The approval procedure in accordance with Section 4 of the Federal Immission Control Act (BImSchG) takes place in the carrier procedure. This means that the immission control authority of the district of Coesfeld manages the procedure and involves various public interest bodies (TÖB).

These are authorities such as the lower nature conservation authority or the responsible road construction authorities, environmental associations such as NABU or BUND, but also the town of Nordkirchen. The town is involved in particular because the procedure sometimes deals with the issue of construction planning law.

The town of Nordkirchen has granted its municipal consent for all 3 wind turbines.

All objections raised by the public authorities are finally weighed up by the approval authority. A decision on the application will then be announced by the immission control authority.

The permit for the first plant at Meinhövels Holz was published in the Coesfeld district's official gazette on 30.06.2023. The official gazette can be downloaded at the following link: ab2316.pdf (kreis-coesfeld.de)

2021_02_25_Dark_Sky.jpg
2021_02_25_Dark_Sky.jpg

We are ENERTRAG

ENERTRAG produces renewable energy in a sustainable way, to keep the Earth habitable. Together. With passion. Energy ahead.

System technology

2 wind turbines are of the Enercon E-138 EP3 E2 type, each with a rated output of 4.2 MW, a hub height of 130 m and a rotor diameter of 138 m. The total height is 199 m. The total height is 199 m.

The 3rd wind turbine is of the Nordex N149 type with a rated output of 5.7 MW, a hub height of 125.4 m and a rotor diameter of 149 m. The total height is therefore 200 m.

Citizen and municipal participation

As announced at the building committee meeting on 27.02.2024, ENERTRAG would like to voluntarily offer the opportunity to participate in one of the wind turbines. To this end, a contact form will be set up here in the coming weeks, which interested citizens of the municipality of Nordkirchen can use to express their interest without obligation. We will shortly be discussing the form of the participation opportunity with the municipality and local banks.

Participation according to §6 EEG (Renewable Energy Sources Act)

As part of the 2021 amendment to the EEG, Section 6 makes it possible to offer municipalities within a radius of 2,500 meters of new wind turbines a unilateral grant or financial participation without consideration. The law does not yet apply retroactively to existing wind farms, but only to newly commissioned WTGs. The grant fulfills the following important criteria: It is to be offered voluntarily and is not earmarked for a specific purpose, it is not included in the calculation of the district levy and is paid annually over the entire 20-year EEG term of the WTG. The amount of the payment depends on the annual amount of energy fed into the grid by the WTG. ENERTRAG regularly offers this voluntary contribution to all municipalities in the specific project areas and is also willing to do so in this specific project.

ENERTRAG is planning an annual energy feed-in volume of 35,000 megawatt hours (MWh) for the Nordkirchen project. This feed-in quantity multiplied by the amount of EUR 2 per megawatt hour (0.2 cents/kWh) payable under Section 6 of the German Renewable Energy Sources Act (EEG) results in a calculated sum of an estimated EUR 70,000 per year, which in turn will be divided proportionately according to the area of the surrounding municipalities within a 2.5 km radius of the respective wind turbine and paid to the municipalities annually over the period of operation of the wind turbine.

The worldwide success of ENERTRAG projects

ENERTRAG uses its 30 years of experience worldwide to accelerate the transition to renewable energies.

Lübs-Ferdinandshof wind project

Nominal Power 4.5 MW
Operating Since 2016
Location Lübs
Status in operation

Lübs-Ferdinandshof wind project

ENERTRAG has been planning a new, regionally significant energy project for several years, for which a separate approval procedure with public participation is to be carried out. Transparent...

Windkraft Uckermark 2024 LR-191.jpg

Penkun wind project

Nominal Power 4.2 MW
Operating Since 2018
Location Penkun
Status in operation

Penkun wind project

ENERTRAG has been planning a wind field south of Penkun for several years, for which a separate approval procedure with public participation is to be carried out. In this context, transparen...

Enertrag_Windpark_23 JR_HR-9.jpg

Lüssow-Schmatzin wind project

Nominal Power 4.8 - 5.3 MW
Operating Since 2019
Location Lüssow
Status planned

Lüssow-Schmatzin wind project

ENERTRAG, wpd and naturwind are planning a new, regionally significant energy project for which a separate approval procedure with public participation will be carried out. The following pag...

IMG_0684.jpg

Schönfeld project complex

Nominal Power 10.5 MW
Operating Since 2020
Location Schönfeld
Status in operation

Schönfeld project complex

Bürgerwind Schönfeld UG & Co. KG initially plans to operate two Vestas V117 wind turbines, each with a rated output of 3.45 MW and a total capacity of 6.9 MW, known as the Schönfeld III proj...

Koppelsee_bald_IBN.jpg

Mattheshöhe project complex

Nominal Power 54.67 MW
Operating Since 2019
Location Matteshöhe
Status in operation

Mattheshöhe project complex

Bürgerwind Matteshöhe UG & Co. KG operates 4 GE 3.6-137 wind turbines with 3.63 MW and a total installed capacity of 14.52 MW in the municipalities of Uckerfelde and Grünow (Brandenburg).

Enertrag DT_Drohne - JEWRO LR-102.jpg

Ramin wind project

Nominal Power 33 MW
Operating Since 2027
Location Ramin
Status planned

Ramin wind project

ENERTRAG has been planning a wind field north-east of Ramin for several years, for which a separate approval procedure with public participation is to be carried out. The following pages are...

geplante_Windenergieanlage.jpeg

Rosow community energy project

Nominal Power 20.7 MW
Operating Since 2020
Location Rosow
Status in operation

Rosow community energy project

ENERTRAG Windfeld Schönfeld III GmbH & Co. KG plans to operate 5 Vestas V117 wind turbines, each with a rated output of 3.45 MW and a total capacity of 17.25 MW, known as the Rosow wind fiel...

News_Service.jpg

Dauer project complex

Nominal Power 27.43 MW
Operating Since 2015
Location Duration
Status in operation

Dauer project complex

The “Dauer III” and “Dauer IV” wind project is located in the north-east of Brandenburg, east of the Prenzlau district of Dauer. The environmentally friendly construction and operation of th...

Windkraft Uckermark 2024 LR-18.jpg

Kassow wind project

Nominal Power 5.7 MW
Operating Since
Location Kassow
Status under construction

Kassow wind project

ENERTRAG has been planning a new, regionally significant energy project for several years, for which a separate approval procedure with public participation is being carried out. In this con...

Enertrag_Windpark_23 JR_HR-219.jpg

Bonnhagen I wind project

Nominal Power 24 MW
Operating Since 2025
Location Bonnhagen
Status under construction

Bonnhagen I wind project

ENERTRAG SE is planning a new, regionally significant energy project for which a separate approval procedure will be carried out. The following pages provide transparent information in this ...

Lageplan_Ramelsloh_2022.jpeg

Ramelsloh wind project

Nominal Power 4.2 MW
Operating Since 2023
Location Ramelsloh
Status in operation

Ramelsloh wind project

ENERTRAG SE is planning the construction and operation of a 4 MW class wind turbine in Ramelsloh in the municipality of Seevetal. The planned and approved turbine is a VESTAS V150 with an ou...

geplante_Windenergieanlage.jpeg

Iserlohn wind project

Nominal Power 12 MW
Operating Since 2025
Location Iserlohn
Status under construction

Iserlohn wind project

ENERTRAG is planning to erect two wind turbines in the outskirts of Iserlohn, between Gerlingsen and Kalthof. Due to the 1,000 m distance regulation to residential areas stipulated in the st...

Wald_Westerwald.jpg

Westerwald II wind project

Nominal Power 34.2 MW
Operating Since 2028
Location Hauser Forest
Status planned

Westerwald II wind project

ENERTRAG SE is planning to erect a total of six wind turbines in the Hauser Wald forest in Hesse on the border with Rhineland-Palatinate, located between the municipalities of Dornburg, Wald...

nordkirchen.jpg

Nordkirchen wind project

Nominal Power 14.1 MW
Operating Since 2027
Location Nordkirchen
Status planned

Nordkirchen wind project

ENERTRAG is planning to erect three wind turbines on the outskirts of the municipality of Nordkirchen, on Münsterstrasse at Meinhövels Holz/Piekenbrock and to the west of the district of Cap...

geplante_Windenergieanlage.jpeg

Anklam combined cycle power plant

Nominal Power 240 MW electrolysis
Operating Since 2024
Location Anklam
Status planned

Anklam combined cycle power plant

Anklam combined cycle power plant

Chemin de Tuleras.1.jpg

CHEMIN DE TULERAS

Nominal Power 12 MW
Operating Since 2006
Location Villemeux, Boulay-Thierry
Status in operation

CHEMIN DE TULERAS

CHEMIN DE TULERAS

France4.jpg

SAINT-ANDRÉ-FARIVILLERS

Nominal Power 11.5 MW
Operating Since 2008
Location Saint-André-Farivillers
Status in operation

SAINT-ANDRÉ-FARIVILLERS

SAINT-ANDRÉ-FARIVILLERS

Campremy-20.jpg

CAMPREMY-BONVILLERS

Nominal Power 11.5 MW
Operating Since 2011
Location Campremy, Bonvillers
Status in operation

CAMPREMY-BONVILLERS

CAMPREMY-BONVILLERS

France.jpg

CHEMIN-BLANC

Nominal Power 12 MW
Operating Since 2012
Location Francastel
Status in operation

CHEMIN-BLANC

CHEMIN-BLANC

Campremy-20.jpg

DEMI-LIEUE

Nominal Power 12 MW
Operating Since 2011
Location Crèvecoeur le Grand, Viefvilliers
Status in operation

DEMI-LIEUE

DEMI-LIEUE

ENERTRAG_-Construction-Levage-sizing.jpg

ROINVILLE

Nominal Power 8 MW
Operating Since 2006
Location Roinville
Status in operation

ROINVILLE

ROINVILLE

France4.jpg

ORESMAUX

Nominal Power 12 MW
Operating Since 2008
Location Oresmaux
Status in operation

ORESMAUX

ORESMAUX

France3.jpg

FRESNOY-AU-VAL

Nominal Power 10 MW
Operating Since 2013
Location Fresnoy, Bougainville
Status in operation

FRESNOY-AU-VAL

FRESNOY-AU-VAL

France4.jpg

BOUGAINVILLE

Nominal Power 12 MW
Operating Since 2005
Location Bougainville
Status in operation

BOUGAINVILLE

BOUGAINVILLE

Campremy-20.jpg

CAIX

Nominal Power 12 MW
Operating Since 2013
Location Caix
Status in operation

CAIX

CAIX

France4.jpg

LIANCOURT

Nominal Power 7 MW
Operating Since 2017
Location Liancourt- Fosse
Status in operation

LIANCOURT

LIANCOURT

France.jpg

REMIGNY-LY-FONTAINE

Nominal Power 18.4 MW
Operating Since 2015
Location Rémigny, Ly-Fontaine
Status in operation

REMIGNY-LY-FONTAINE

REMIGNY-LY-FONTAINE

Campremy-20.jpg

LA BRIE CHAMPENOISE

Nominal Power 20 MW
Operating Since 2015
Location Corfélix, La Villeneuve les Charleville, Charleville
Status in operation

LA BRIE CHAMPENOISE

LA BRIE CHAMPENOISE

ENERTRAG_-Construction-Levage-sizing.jpg

ANGUILCOURT

Nominal Power 12 MW
Operating Since 2016
Location Anguilcourt, Brissay-Choigny
Status in operation

ANGUILCOURT

The Anguilcourt wind farm, commissioned in 2016 and located in the Hauts-de-France region, comprises 6 Senvion wind turbines with a total output of 12 MW.

France.jpg

SISSY-MÉZIERES

Nominal Power 10 MW
Operating Since 2017
Location Sissy, Châtillon-sur-Oise, Mézières
Status in operation

SISSY-MÉZIERES

SISSY-MÉZIERES

France4.jpg

SOUTH TERNOIS

Nominal Power 13.8 MW
Operating Since 2011
Location Croisette, Héricourt, Hauteclocque
Status in operation

SOUTH TERNOIS

SOUTH TERNOIS

France3.jpg

EAST TERNOIS

Nominal Power 11.5 MW
Operating Since 2011
Location Ligny Saint Flochel
Status in operation

EAST TERNOIS

TERNOIS EST

ENERTRAG_-Construction-Levage-sizing.jpg

CROISETTE I

Nominal Power 12 MW
Operating Since 2015
Location Croisette
Status in operation

CROISETTE I

CROISETTE I

France3.jpg

CROISETTE II

Nominal Power 5 MW
Operating Since 2015
Location Beauvois, Croix-en-Ternois, Siracourt
Status in operation

CROISETTE II

CROISETTE II

France.jpg

LA VILLE-AUX-BOIS-LÈS-DIZY

Nominal Power 8 MW
Operating Since 2016
Location La Ville-aux-Bois-Lès-Dizy
Status in operation

LA VILLE-AUX-BOIS-LÈS-DIZY

LA VILLE-AUX-BOIS-LÈS-DIZY

France4.jpg

TERNOIS NORTH

Nominal Power 9.2 MW
Operating Since 2012
Location Brias, Monchy Breton
Status in operation

TERNOIS NORTH

TERNOIS NORTH

Contact

Fields
Cloudflare Turnstile Captcha

I consent to the processing of my personal data in accordance with the privacy policy. I have read and understood the privacy policy