Skip to main content
Enertrag DT_Drohne - JEWRO LR-49.jpg

Westerwald II wind project

Westerwald II wind project

ENERTRAG SE is planning to erect a total of six wind turbines in the Hauser Wald forest in Hesse on the border with Rhineland-Palatinate, located between the municipalities of Dornburg, Waldbrunn, Neunkirchen and Irmtraut.

ENERTRAG has been developing the wind farm since 2014. In addition to the informal involvement of local politicians, this has involved carrying out numerous studies and expert reports in preparation for the permit application. With the concrete preparation of the permit application now underway, this website has also been launched to provide ongoing public information on the progress of the project.

According to yield forecasts, the six planned Nordex N149 wind turbines, each with 5.7 megawatts (MW), will produce around 69,000 MWh of clean electricity per year. This means that around 19,000 households in the region can be supplied with locally generated, sustainable energy. The converted electrical energy can also save over 50,000 tons of CO2 annually.

ENERTRAG is thus acting for a clean and secure future for the benefit of the people in the country and future generations on the basis of 100% renewable energies.

westerwald_karte.jpg

Citizen information on the wind farm project in Hauser Wald dated 20/01/2023

01/30/2023

Around 150 local residents took up the invitation to find out more about the wind farm project in Hauser Wald with great interest on January 20.

You can read the detailed report directly on the Publication page of the municipality of Waldbrunn (Westerwald). Thank you for your interest and the good exchange.

Click here for the follow-up report on the information event Wind power | Waldbrunn - Westerwald

Aufsichtsratsvorsitzender_2022_Joerg_Mueller.jpg
"Together, we are committed to everything that makes energy safe and sustainable as a basis of life for us humans. In this way, we strengthen rural regions with well-paid work, training and affordable energy. At the same time, we pay attention to promoting infrastructure and culture at all our locations."

Jörg Müller

Chairman of the Supervisory Board of ENERTRAG SE

Location and planning area

The planning area is located in Hauser Wald, on land belonging to the municipalities of Waldbrunn, Dornburg and HessenForst.

The wind suitability area in question is suitable for the construction of wind turbines according to regional planning criteria and is designated as priority area 1103 in the 2019 Central Hessen Energy Sub-regional Plan. This is an area which, according to the list of criteria, maintains a sufficient protective distance from residential buildings with regard to noise and shadow emissions and is not located in any nature conservation area or water protection area III.

In the Central Hesse region, 127 areas covering approx. 12,100 hectares have been designated as wind priority areas. This corresponds to 2.2 percent of the region's area.

Plan_LAyout_Westerwald.png

Approval procedure and timetable

The plan is to submit the complete application for approval in accordance with Section 4 BImSchG to the RP Gießen in mid-2023. Approval is expected to be granted at the end of 2024.

We will keep you informed about the next steps here.

Windpark_Westerwald_Planung_mit_Zeittafel_Stand_18012023.png

Wind energy im Forst

Several dry years, storm events and pest infestations have taken a heavy toll on forests in Germany, and the drought years of 2018 to 2020 in particular meant that in some regions soils dried out to a depth of 1.80 meters, foliage was shed prematurely and the bark beetle was able to spread en masse. In Hesse, forests make up around 42 percent of the state's land area, or around 894,000 hectares. Here, too, some of the forest areas are severely damaged - the results of the 2022 forest condition survey show that the Hessian forest has been in a persistently poor state of vitality since 2019 (Hessian Ministry for the Environment, Climate Protection, Agriculture and Consumer Protection: Forest Condition Report 2022).

Wind energy can provide partial relief. There is therefore much to be said for the use of wind turbines in forests: Wind energy in Germany recently saved 100.9 million tons of greenhouse gases that would otherwise affect the forest (Bundesverband Windenergie 2021: Windenergie im Forst. How wind energy contributes to forest protection). In addition, the compensation of built-up areas through reforestation and forest conversion measures promotes the creation of climate-resistant forest stands.

In the revised State Development Plan (LEP) of 2018, the state government of the CDU and Bündnis 90/Die Grünen committed to promoting the expansion of wind energy in Hesse by providing suitable state-owned forest land. The basis for the construction of wind turbines in forests in Hesse is provided by the third ordinance amending the LEP. According to this, the construction of wind turbines in forests is possible under certain conditions. In the case of this project in Hauser Wald, particular care is taken to ensure that the existing road network is used primarily as access routes and that no young beech stands are cleared.

Wald_Westerwald.jpg

Photo: Fork in the path in the Hauser Wald priority area: view towards WTG D5 (towards the car)

We are ENERTRAG

ENERTRAG produces renewable energy in a sustainable way, to keep the Earth habitable. Together. With passion. Energy ahead.

Learn more

System technology

The six Nordex N149 wind turbines, each with a rated output of 5.7 MW, have a hub height of 164 m and a rotor diameter of 149 m. This results in a total height of 238.5 m.

To the manufacturer page N149/5.X - Nordex SE

Citizen and municipal participation

Participation takes many forms. In addition to informal participation within the planning process, it is of course also about economic participation. It is also about ensuring that residents and communities in the vicinity of wind farms benefit appropriately from local wind power generation.

Participation in accordance with Section 6 EEG (Renewable Energy Sources Act)

Since the EEG 2021, Section 6 has made it possible to offer municipalities within a radius of 2,500 meters of new wind turbines a unilateral grant or financial participation without consideration. The law does not yet apply retroactively to existing wind farms, but only to newly commissioned WTGs. The grant fulfills the following important criteria: It is to be offered voluntarily and is not earmarked for a specific purpose, it is not included in the calculation of the district levy and is paid annually over the entire 20-year EEG term of the WTG. The amount of the payment depends on the annual amount of energy fed into the grid by the WTG. ENERTRAG regularly offers this voluntary contribution to all municipalities in the specific project areas and is also prepared to do so in this specific project.

In the Westerwald II project, ENERTRAG is planning an annual energy feed-in volume of an estimated 69,000 megawatt hours (MWh). This feed-in quantity multiplied by the amount of EUR 2 per megawatt hour (0.2 cents/kWh) payable under Section 6 of the German Renewable Energy Sources Act (EEG) results in a calculated sum of an estimated EUR 138,000 per year, which in turn is divided proportionately according to the municipal area or the area of the surrounding municipalities within a 2.5 km radius of the respective WTG, and is paid to the municipalities annually over the period of operation of the WTG.

Windpark_Westerwald_EEG___6_Stand_23112022.png

The worldwide success of ENERTRAG projects

ENERTRAG uses its 30 years of experience worldwide to accelerate the transition to renewable energies.

Lübs-Ferdinandshof wind project

Nominal Power 4.5 MW
Operating Since 2016
Location Lübs
Status in operation

Lübs-Ferdinandshof wind project

ENERTRAG has been planning a new, regionally significant energy project for several years, for which a separate approval procedure with public participation is to be carried out. Transparent...

Windkraft Uckermark 2024 LR-191.jpg

Penkun wind project

Nominal Power 4.2 MW
Operating Since 2018
Location Penkun
Status in operation

Penkun wind project

ENERTRAG has been planning a wind field south of Penkun for several years, for which a separate approval procedure with public participation is to be carried out. In this context, transparen...

Enertrag_Windpark_23 JR_HR-9.jpg

Lüssow-Schmatzin wind project

Nominal Power 4.8 - 5.3 MW
Operating Since 2019
Location Lüssow
Status planned

Lüssow-Schmatzin wind project

ENERTRAG, wpd and naturwind are planning a new, regionally significant energy project for which a separate approval procedure with public participation will be carried out. The following pag...

IMG_0684.jpg

Schönfeld project complex

Nominal Power 10.5 MW
Operating Since 2020
Location Schönfeld
Status in operation

Schönfeld project complex

Bürgerwind Schönfeld UG & Co. KG initially plans to operate two Vestas V117 wind turbines, each with a rated output of 3.45 MW and a total capacity of 6.9 MW, known as the Schönfeld III proj...

Koppelsee_bald_IBN.jpg

Mattheshöhe project complex

Nominal Power 54.67 MW
Operating Since 2019
Location Matteshöhe
Status in operation

Mattheshöhe project complex

Bürgerwind Matteshöhe UG & Co. KG operates 4 GE 3.6-137 wind turbines with 3.63 MW and a total installed capacity of 14.52 MW in the municipalities of Uckerfelde and Grünow (Brandenburg).

Enertrag DT_Drohne - JEWRO LR-102.jpg

Ramin wind project

Nominal Power 33 MW
Operating Since 2027
Location Ramin
Status planned

Ramin wind project

ENERTRAG has been planning a wind field north-east of Ramin for several years, for which a separate approval procedure with public participation is to be carried out. The following pages are...

geplante_Windenergieanlage.jpeg

Rosow community energy project

Nominal Power 20.7 MW
Operating Since 2020
Location Rosow
Status in operation

Rosow community energy project

ENERTRAG Windfeld Schönfeld III GmbH & Co. KG plans to operate 5 Vestas V117 wind turbines, each with a rated output of 3.45 MW and a total capacity of 17.25 MW, known as the Rosow wind fiel...

News_Service.jpg

Dauer project complex

Nominal Power 27.43 MW
Operating Since 2015
Location Duration
Status in operation

Dauer project complex

The “Dauer III” and “Dauer IV” wind project is located in the north-east of Brandenburg, east of the Prenzlau district of Dauer. The environmentally friendly construction and operation of th...

Windkraft Uckermark 2024 LR-18.jpg

Kassow wind project

Nominal Power 5.7 MW
Operating Since
Location Kassow
Status under construction

Kassow wind project

ENERTRAG has been planning a new, regionally significant energy project for several years, for which a separate approval procedure with public participation is being carried out. In this con...

Enertrag_Windpark_23 JR_HR-219.jpg

Bonnhagen I wind project

Nominal Power 24 MW
Operating Since 2025
Location Bonnhagen
Status under construction

Bonnhagen I wind project

ENERTRAG SE is planning a new, regionally significant energy project for which a separate approval procedure will be carried out. The following pages provide transparent information in this ...

Lageplan_Ramelsloh_2022.jpeg

Ramelsloh wind project

Nominal Power 4.2 MW
Operating Since 2023
Location Ramelsloh
Status in operation

Ramelsloh wind project

ENERTRAG SE is planning the construction and operation of a 4 MW class wind turbine in Ramelsloh in the municipality of Seevetal. The planned and approved turbine is a VESTAS V150 with an ou...

geplante_Windenergieanlage.jpeg

Iserlohn wind project

Nominal Power 12 MW
Operating Since 2025
Location Iserlohn
Status under construction

Iserlohn wind project

ENERTRAG is planning to erect two wind turbines in the outskirts of Iserlohn, between Gerlingsen and Kalthof. Due to the 1,000 m distance regulation to residential areas stipulated in the st...

Wald_Westerwald.jpg

Westerwald II wind project

Nominal Power 34.2 MW
Operating Since 2028
Location Hauser Forest
Status planned

Westerwald II wind project

ENERTRAG SE is planning to erect a total of six wind turbines in the Hauser Wald forest in Hesse on the border with Rhineland-Palatinate, located between the municipalities of Dornburg, Wald...

nordkirchen.jpg

Nordkirchen wind project

Nominal Power 14.1 MW
Operating Since 2027
Location Nordkirchen
Status planned

Nordkirchen wind project

ENERTRAG is planning to erect three wind turbines on the outskirts of the municipality of Nordkirchen, on Münsterstrasse at Meinhövels Holz/Piekenbrock and to the west of the district of Cap...

geplante_Windenergieanlage.jpeg

Anklam combined cycle power plant

Nominal Power 240 MW electrolysis
Operating Since 2024
Location Anklam
Status planned

Anklam combined cycle power plant

Anklam combined cycle power plant

Chemin de Tuleras.1.jpg

CHEMIN DE TULERAS

Nominal Power 12 MW
Operating Since 2006
Location Villemeux, Boulay-Thierry
Status in operation

CHEMIN DE TULERAS

CHEMIN DE TULERAS

France4.jpg

SAINT-ANDRÉ-FARIVILLERS

Nominal Power 11.5 MW
Operating Since 2008
Location Saint-André-Farivillers
Status in operation

SAINT-ANDRÉ-FARIVILLERS

SAINT-ANDRÉ-FARIVILLERS

Campremy-20.jpg

CAMPREMY-BONVILLERS

Nominal Power 11.5 MW
Operating Since 2011
Location Campremy, Bonvillers
Status in operation

CAMPREMY-BONVILLERS

CAMPREMY-BONVILLERS

France.jpg

CHEMIN-BLANC

Nominal Power 12 MW
Operating Since 2012
Location Francastel
Status in operation

CHEMIN-BLANC

CHEMIN-BLANC

Campremy-20.jpg

DEMI-LIEUE

Nominal Power 12 MW
Operating Since 2011
Location Crèvecoeur le Grand, Viefvilliers
Status in operation

DEMI-LIEUE

DEMI-LIEUE

ENERTRAG_-Construction-Levage-sizing.jpg

ROINVILLE

Nominal Power 8 MW
Operating Since 2006
Location Roinville
Status in operation

ROINVILLE

ROINVILLE

France4.jpg

ORESMAUX

Nominal Power 12 MW
Operating Since 2008
Location Oresmaux
Status in operation

ORESMAUX

ORESMAUX

France3.jpg

FRESNOY-AU-VAL

Nominal Power 10 MW
Operating Since 2013
Location Fresnoy, Bougainville
Status in operation

FRESNOY-AU-VAL

FRESNOY-AU-VAL

France4.jpg

BOUGAINVILLE

Nominal Power 12 MW
Operating Since 2005
Location Bougainville
Status in operation

BOUGAINVILLE

BOUGAINVILLE

Campremy-20.jpg

CAIX

Nominal Power 12 MW
Operating Since 2013
Location Caix
Status in operation

CAIX

CAIX

France4.jpg

LIANCOURT

Nominal Power 7 MW
Operating Since 2017
Location Liancourt- Fosse
Status in operation

LIANCOURT

LIANCOURT

France.jpg

REMIGNY-LY-FONTAINE

Nominal Power 18.4 MW
Operating Since 2015
Location Rémigny, Ly-Fontaine
Status in operation

REMIGNY-LY-FONTAINE

REMIGNY-LY-FONTAINE

Campremy-20.jpg

LA BRIE CHAMPENOISE

Nominal Power 20 MW
Operating Since 2015
Location Corfélix, La Villeneuve les Charleville, Charleville
Status in operation

LA BRIE CHAMPENOISE

LA BRIE CHAMPENOISE

ENERTRAG_-Construction-Levage-sizing.jpg

ANGUILCOURT

Nominal Power 12 MW
Operating Since 2016
Location Anguilcourt, Brissay-Choigny
Status in operation

ANGUILCOURT

The Anguilcourt wind farm, commissioned in 2016 and located in the Hauts-de-France region, comprises 6 Senvion wind turbines with a total output of 12 MW.

France.jpg

SISSY-MÉZIERES

Nominal Power 10 MW
Operating Since 2017
Location Sissy, Châtillon-sur-Oise, Mézières
Status in operation

SISSY-MÉZIERES

SISSY-MÉZIERES

France4.jpg

SOUTH TERNOIS

Nominal Power 13.8 MW
Operating Since 2011
Location Croisette, Héricourt, Hauteclocque
Status in operation

SOUTH TERNOIS

SOUTH TERNOIS

France3.jpg

EAST TERNOIS

Nominal Power 11.5 MW
Operating Since 2011
Location Ligny Saint Flochel
Status in operation

EAST TERNOIS

TERNOIS EST

ENERTRAG_-Construction-Levage-sizing.jpg

CROISETTE I

Nominal Power 12 MW
Operating Since 2015
Location Croisette
Status in operation

CROISETTE I

CROISETTE I

France3.jpg

CROISETTE II

Nominal Power 5 MW
Operating Since 2015
Location Beauvois, Croix-en-Ternois, Siracourt
Status in operation

CROISETTE II

CROISETTE II

France.jpg

LA VILLE-AUX-BOIS-LÈS-DIZY

Nominal Power 8 MW
Operating Since 2016
Location La Ville-aux-Bois-Lès-Dizy
Status in operation

LA VILLE-AUX-BOIS-LÈS-DIZY

LA VILLE-AUX-BOIS-LÈS-DIZY

France4.jpg

TERNOIS NORTH

Nominal Power 9.2 MW
Operating Since 2012
Location Brias, Monchy Breton
Status in operation

TERNOIS NORTH

TERNOIS NORTH

Contact

Fields
Cloudflare Turnstile Captcha

I consent to the processing of my personal data in accordance with the privacy policy. I have read and understood the privacy policy