240 MW electrolysis (electrical connection line, 2 expansion stages) |
Up to 20,400 t/a of green hydrogen for regional use |
Heat supply for surrounding businesses |
Total investment: approx. 370 million euros |
350,000 t CO2 savings* per year |
"Together, we will overcome fossil fuels by 2040. ENERTRAG integrated power plants have the potential to completely replace conventional power plants."
Dr. Tobias Bischof-Niemz
ENERTRAG Board Member Projects International & Technology
ENERTRAG produces renewable energies sustainably to keep the world a place worth living in. Together. With passion. One energy ahead.
The goal: 100 per cent fossil-free - worldwide. To achieve this, ENERTRAG is turning pioneering ideas into sustainable, viable solutions.
ENERTRAG has been planning a new, regionally significant energy project for several years, for which a separate approval procedure with public participation is to be carried out. Transparent...
ENERTRAG has been planning a wind field south of Penkun for several years, for which a separate approval procedure with public participation is to be carried out. In this context, transparen...
ENERTRAG, wpd and naturwind are planning a new, regionally significant energy project for which a separate approval procedure with public participation will be carried out. The following pag...
Bürgerwind Schönfeld UG & Co. KG initially plans to operate two Vestas V117 wind turbines, each with a rated output of 3.45 MW and a total capacity of 6.9 MW, known as the Schönfeld III proj...
Bürgerwind Matteshöhe UG & Co. KG operates 4 GE 3.6-137 wind turbines with 3.63 MW and a total installed capacity of 14.52 MW in the municipalities of Uckerfelde and Grünow (Brandenburg).
ENERTRAG has been planning a wind field north-east of Ramin for several years, for which a separate approval procedure with public participation is to be carried out. The following pages are...
ENERTRAG Windfeld Schönfeld III GmbH & Co. KG plans to operate 5 Vestas V117 wind turbines, each with a rated output of 3.45 MW and a total capacity of 17.25 MW, known as the Rosow wind fiel...
The “Dauer III” and “Dauer IV” wind project is located in the north-east of Brandenburg, east of the Prenzlau district of Dauer. The environmentally friendly construction and operation of th...
ENERTRAG has been planning a new, regionally significant energy project for several years, for which a separate approval procedure with public participation is being carried out. In this con...
ENERTRAG SE is planning a new, regionally significant energy project for which a separate approval procedure will be carried out. The following pages provide transparent information in this ...
ENERTRAG SE is planning the construction and operation of a 4 MW class wind turbine in Ramelsloh in the municipality of Seevetal. The planned and approved turbine is a VESTAS V150 with an ou...
ENERTRAG is planning to erect two wind turbines in the outskirts of Iserlohn, between Gerlingsen and Kalthof. Due to the 1,000 m distance regulation to residential areas stipulated in the st...
ENERTRAG SE is planning to erect a total of six wind turbines in the Hauser Wald forest in Hesse on the border with Rhineland-Palatinate, located between the municipalities of Dornburg, Wald...
ENERTRAG is planning to erect three wind turbines on the outskirts of the municipality of Nordkirchen, on Münsterstrasse at Meinhövels Holz/Piekenbrock and to the west of the district of Cap...
Anklam combined cycle power plant
CHEMIN DE TULERAS
SAINT-ANDRÉ-FARIVILLERS
CAMPREMY-BONVILLERS
CHEMIN-BLANC
DEMI-LIEUE
ROINVILLE
ORESMAUX
FRESNOY-AU-VAL
BOUGAINVILLE
LIANCOURT
REMIGNY-LY-FONTAINE
LA BRIE CHAMPENOISE
The Anguilcourt wind farm, commissioned in 2016 and located in the Hauts-de-France region, comprises 6 Senvion wind turbines with a total output of 12 MW.
SISSY-MÉZIERES
SOUTH TERNOIS
TERNOIS EST
CROISETTE I
CROISETTE II
LA VILLE-AUX-BOIS-LÈS-DIZY
TERNOIS NORTH
Further information on the processing of your personal data can be found in our privacy notice.